MORAKO II POLYTECHNIC Education and Vocation Training On-Going 1,254,274.94 Manga Feedback
KIENDEGE YOUTH POLYTECHNIC Education and Vocation Training On-Going 1,736,777.50 Gachuba Feedback
KIBAARA PRIMARY ECD CLASSROOM Education and Vocation Training On-Going 1,501,932.33 Bomwagamo Feedback
GEKENDO DOK ECD CLASSROOM Education and Vocation Training On-Going 1,044,655.40 Ekerenyo Feedback
GESORE PRIMARY ECD CLASSROOM Education and Vocation Training On-Going 1,105,886.00 Township Feedback
NYAUTUTU PRIMARY ECD CLASSROOM Education and Vocation Training On-Going 995,860.00 Bokeira Feedback
MOTOMBEBA PRIMARY ECD CLASSROOM Education and Vocation Training On-Going 1,709,660.41 Kemera Feedback
GETAARI PRIMARY ECD CLASSROOM Education and Vocation Training On-Going 2,352,972.42 Nyamaiya Feedback
NYARONGE PRIMARY ECD CLASSROOM Education and Vocation Training On-Going 2,102,723.76 Gesima Feedback
RIBAITA PRIMARY ECD CLASSROOM Education and Vocation Training On-Going 1,119,537.17 Esise Feedback
KUJA PRIMARY ECD CLASSROOM Education and Vocation Training On-Going 2,980,307.32 Gachuba Feedback
NYACHURURU PRIMARY ECD Education and Vocation Training On-Going 2,550,926.22 Bosamaro Feedback
CONST. OF ECDE CENTRE AT NYANKONO PRI SCH. NYCG/Q168/2015-2016. Education and Vocation Training On-Going Mekenene Feedback
CONST. OF ECDE CENTRE AT RIABAGAKA PRI SCH. NYCG/Q170/2015-2016 Education and Vocation Training On-Going 3,950,000.00 Gachuba Feedback
Costruction and Completion of twin staff house with two No.door pit latrine at Sere health facility Improved infrustructure Health Services On-Going 3,836,980.00 Bomwagamo Feedback
CONST. OF ECDE CENTRE AT RIAKWORO PRI SCH. NYCG/Q171/2015-2016 Education and Vocation Training On-Going 3,594,805.20 Gesima Feedback
Proposed Rehabilitation of Kenyerere Borehole Water, Sanitation, and Irrrigation On-Going 1,142,942.78 Magwagwa Feedback
CONST. OF ECDE CENTRE AT BITICHA PRI SCH.NYCG/Q173/2015-2016 Education and Vocation Training On-Going 3,319,742.00 Rigoma Feedback
Proposed Rehabilitation of Marani Borehole Water, Sanitation, and Irrrigation On-Going 1,405,181.40 Bosamaro Feedback
Proposed Construction and Protection of Water Springs Water, Sanitation, and Irrrigation On-Going 1,249,694.80 Bokeira Feedback
CONST. OF ECDE CENTRE AT NYAKENYOMISIA PRI. SCH. NYCG/Q176/2015-2016 Education and Vocation Training On-Going 3,242,130.40 Magwagwa Feedback
Restoration of Gesebei dam Agriculture, Livestock and Fisheries On-Going 4,496,928.67 Nyansiongo Feedback
CONST. OF ECDE CENTRE AT KEGINGA D.E.B PRI. SCH. NYCG/Q177/2015-2016 Education and Vocation Training On-Going Nyansiongo Feedback
Restoration of Kenyerere public land Agriculture, Livestock and Fisheries On-Going 4,087,906.00 Rigoma Feedback
CONST. OF ECDE CENTRE AT RIANYAKANG’I PRI. SCH. NYCG/Q178/2015-2016 Education and Vocation Training On-Going Kiabonyoru Feedback
CONST. OF ECDE CENTRE AT ITIBO PRI. SCH. NYCG/Q179/2015-2016 Education and Vocation Training On-Going 3,390,420.45 Bomwagamo Feedback
CONST. OF ECDE CENTRE AT NYAINOGWA PRI. SCH. NYCG/Q181/2015-2016 Education and Vocation Training On-Going Bonyamatuta Feedback
Construction of Ikonge market Material recovery facility Agriculture, Livestock and Fisheries On-Going 1,249,956.38 Ekerenyo Feedback
CONST. OF ECDE CENTRE AT GESENENO PRI. SCH. NYCG/Q182/2015-2016 Education and Vocation Training On-Going Township Feedback
CONST. OF ECDE CENTRE AT EKERUBO GIETAI PRI. SCH. NYCG/Q183/2015-2016 Education and Vocation Training On-Going Itibo Feedback
Construction of Miruka market Material recovery facility Agriculture, Livestock and Fisheries On-Going 1,249,860.56 Nyamaiya Feedback
CONST. OF ECDE CENTRE AT KIAMOGAKI PRI. SCH. NYCG/Q184/2015-2016. Education and Vocation Training On-Going 3,356,674.60 Ekerenyo Feedback
Construction of Kemera market Material recovery facility Agriculture, Livestock and Fisheries On-Going 1,201,412.72 Kemera Feedback
CONST. OF ECDE CENTRE AT MECHEO PRI. SCH. NYCG/Q185/2015-2016 Education and Vocation Training On-Going 1,184,069.68 Esise Feedback
CONSTRUCTION OF A WORKSHOP AT MOBAMBA PRI. SCH. NYCG/Q196/2015-2016 Education and Vocation Training On-Going 916,179.52 Bonyamatuta Feedback
Establishment of Nyamira South sub county indigenous tree nursery Agriculture, Livestock and Fisheries On-Going 2,998,397.00 Township Feedback
CONST. OF A WORKSHOP AT RIAMANOTI PRIM NYCG/Q198/2015-2016 Education and Vocation Training On-Going 1,269,936.22 Nyansiongo Feedback
Establishment of Borabu sub county indigenous tree nursery Agriculture, Livestock and Fisheries On-Going 2,998,803.37 Nyansiongo Feedback
CONST. OF A WORKSHOP AT BOMONDO PRI. SCH. NYCG/Q200/2015-2016 Education and Vocation Training On-Going Township Feedback
CONST. ECDE CENTRE AT NYABWERI PRI. SCH. NYCG/Q230/2015-2016 Education and Vocation Training On-Going Bomwagamo Feedback
Establishment of Manga sub county indigenous tree nursery Agriculture, Livestock and Fisheries On-Going 2,999,116.66 Manga Feedback
CONST. ECDE CENTRE AT RIANG’OMBE PRI. SCH. NYCG/Q231/2015-2016 Education and Vocation Training On-Going Itibo Feedback
Biticha Borehole water drilling, equiping and distribution project Water, Sanitation, and Irrrigation On-Going 5,442,633.70 Rigoma Feedback
CONST. ECDE CENTRE AT KEREMA PRI. SCH. NYCG/Q232/2015-2016 Education and Vocation Training On-Going 3,355,468.03 Kiabonyoru Feedback
Egechini Borehole Water drilling, equipping and distribution project Water, Sanitation, and Irrrigation On-Going 5,412,559.28 Itibo Feedback
CONST. ECDE CENTRE AT NYATIENO PRI. SCH. NYCG/Q233/2015-2016 Education and Vocation Training On-Going 1,865,361.20 Gesima Feedback
Ikonge girls borehole water drilling, equipping and distribution project Water, Sanitation, and Irrrigation On-Going 5,345,583.99 Ekerenyo Feedback
CONST. OF ECDE CENTRE AT NYAMOTENTEMI PRI. SCH. NYCG/Q256/2015-2016 Education and Vocation Training On-Going Bogichora Feedback
Keginga borehole water drilling, equipping and distribution project. Water, Sanitation, and Irrrigation On-Going 5,433,746.53 Nyansiongo Feedback
Proposed Construction and Completion of Out Patient Department and Inpatient Wards at Ekerenyo Health Facility Improved infrustructure Health Services On-Going 34,589,321.40 Ekerenyo Feedback
Proposed Construction and Completion of Nyamira Eye Hospital Service Block at Nyamwetureko Health Facility Improved infrustructure Health Services On-Going 35,104,864.00 Bosamaro Feedback
CONST. OF ECDE CENTRE AT NYAISA PRI. SCH. NYCG/Q259/2015-2016 Education and Vocation Training On-Going 3,207,311.26 Manga Feedback
Rionguti Borehole water drilling, equipping and distribution project. Water, Sanitation, and Irrrigation On-Going 5,663,513.00 Magombo Feedback
CONST. OF ECDE CENTRE AT KERORA PRI. SCH. NYCG/Q260/2015-2016 Education and Vocation Training On-Going 3,697,064.83 Kemera Feedback
Nyameru Borehole Water drilling, equipping and distribution Project. Water, Sanitation, and Irrrigation On-Going 5,276,856.24 Bogichora Feedback
CONST. OF ECDE CENTRE AT KEBUSE PRI. SCH. NYCG/Q263/2015-2016 Education and Vocation Training On-Going Esise Feedback
Moruga Borehole Water drilling, equipping and distribution Project . Water, Sanitation, and Irrrigation On-Going 5,968,699.23 Bosamaro Feedback
Proposed Construction and Completion of Twin Staff House with two number door pit Latrine at Chaina Health Facility Improved infrustructure Health Services On-Going 3,505,363.20 Itibo Feedback
CONST. OF A WORKSHOP AT RAITIGO YOUTH POLYTECHNICNYCG/Q265/2015-2016 Education and Vocation Training On-Going Esise Feedback
Raitigo water dam desilting supply project - Water, Sanitation, and Irrrigation On-Going 9,090,651.77 Esise Feedback
Promotion of tissue culture bananas project Agriculture, Livestock and Fisheries On-Going 2,957,687.04 Esise Feedback
Promotion of tissue culture bananas project Agriculture, Livestock and Fisheries On-Going 2,957,687.00 Bogichora Feedback
CONST. OF A WORKSHOP AT MANG’ONG’O YOUTH POLYTECHNIC NYCG/Q261/2015-2016 Education and Vocation Training On-Going Bogichora Feedback
CONST. OF ECDE CENTRE AT RANGENYO PRI SCH. NYCG/Q304/2015-2016 Education and Vocation Training On-Going Bogichora Feedback
CONST. OF ECDE CENTRE AT MATERIO PRI SCH. NYCG/Q287/2015-2016 Education and Vocation Training On-Going Bogichora Feedback
Proposed Construction and Completion of OPD Block with two No.door pit latrine at Ensakia Health Facility Improved infrustructure Health Services On-Going 3,799,498.80 Esise Feedback
CONST. OF ETONO YOUTH POLYTECHNIC NYCG/Q264/2015-2016 Education and Vocation Training On-Going 1,768,373.60 Bomwagamo Feedback
Completion of OPD block at Isoge Health Facility Improved infrustructure Health Services On-Going 4,998,670.00 Esise Feedback
Renovation of Mortuary and Installation of a New Cooling System at Nyamira County Referral Improved infrustructure Health Services On-Going 9,040,205.00 Township Feedback
Construction and Completion of Outpatient Block at Nyamira County Industrial Park – Sironga Improved infrustructure Health Services On-Going 4.00 Bogichora Feedback
Construction and Completion of Twin Staff House at Nyaigesa Health Facility Improved infrustructure Health Services On-Going 4,786,403.60 Nyamaiya Feedback
Construction of Etono Health Centre Maternity Wards Improved infrustructure Health Services On-Going 4,890,330.00 Bomwagamo Feedback
Construction of OPD at Biticha Morera Dispensary Improved infrustructure Health Services On-Going 3,189,680.00 Rigoma Feedback
Construction and Completion of Outpatient Block at Nyangoso Health Facility Improved infrustructure Health Services On-Going 4,221,850.00 Township Feedback
Construction of 30No. vending platforms, supply, delivery, installation, testing and commissioning of 25No solar powered street lights in Keroka block B in Nyamira County Improved infrustructure Lands, Housing and Urban Development On-Going 20,000,000.00 Rigoma Feedback
Construction of roads, footpaths, storm water, drainage, public lighting, water,& sanitation and social amenities for Keroka block B settlement in Nyamira County Improved infrustructure Lands, Housing and Urban Development On-Going 84,189,603.32 Rigoma Feedback
REHABILITATION AND MANTAINANCE OF RIONSONGO, NYAISA ,MOROMBA UR-32 Roads, transport, public works and Disaster Management On-Going 9,344,400.00 Manga Feedback
KIENDEGE-NYACHICHI-OMOGONCHORO UR-29 Roads, transport, public works and Disaster Management On-Going 940,663.60 Kemera Feedback
RIABICHANGA-RIANYABIO ROAD UR-2 Roads, transport, public works and Disaster Management On-Going 4,113,877.10 Magombo Feedback
MANGA STADIUM CGN/143/2013-14 Roads, transport, public works and Disaster Management On-Going 45,019,998.00 Manga Feedback
PROPOSED SECURITY FENCE FOR GOVERNOR'S RESIDENCE Roads, transport, public works and Disaster Management On-Going 10,922,328.00 Township Feedback
CONSTRUCTION OF SEPTIC TANK, TOILET BLOCK AND GENERATOR HOUSE Roads, transport, public works and Disaster Management On-Going 3,684,894.00 Township Feedback
CULVERTS AND DRAINAGE WORKS WITHIN NYAMIRA COUNTY CGN/T046/2014-2015 Roads, transport, public works and Disaster Management On-Going 3,582,091.60 Township Feedback
ERONGE-KENYERERE-KABAATIA ROAD 3.8 Km Roads, transport, public works and Disaster Management On-Going Bonyamatuta Feedback
BUNDO-NYAIGESA-KEERA ROAD 4Km. Roads, transport, public works and Disaster Management On-Going 684,750.00 Bonyamatuta Feedback
EBATE-ICHUNI TBC ROAD Roads, transport, public works and Disaster Management On-Going Rigoma Feedback
RIANYAMWEYA-DAMSIDE ROAD Roads, transport, public works and Disaster Management On-Going Feedback
KEGINGA-RIONSONGO ROAD Roads, transport, public works and Disaster Management On-Going 1,598,500.00 Feedback
REPAIR & MAINTANANCE OF GESERO-NDURUMO ROAD NYCG/KRB/Q312/2015-2016 Roads, transport, public works and Disaster Management On-Going Bosamaro Feedback
REPAIR & MAINTANANCE OF KENYANSORO- MOKARATE-MOTEOMOKAMBA-RIKURUMA-NYABWARORO ROADNYCG/KRB/Q318/2015-2016 Roads, transport, public works and Disaster Management On-Going Magwagwa Feedback
REPAIR & MAINTANANCE OF NYANSIONGO-RIAMOMANYI-SIMBAUT-TINDERET ROAD NYCG/KRB/Q321/2015-2016 Roads, transport, public works and Disaster Management On-Going Nyansiongo Feedback
REPAIR AND MAINTANANCE OF RIYABE-KENYERERE TBC ROAD NYCG/KRB/Q325/2015-2016 Roads, transport, public works and Disaster Management On-Going Rigoma Feedback
ESANI SPRING Water, Sanitation, and Irrrigation On-Going 1,830,133.20 Gesima Feedback
KEMERA WATER SPRING Water, Sanitation, and Irrrigation On-Going 3,660,293.00 Kemera Feedback
RITONGO POLYTECHNIC Education and Vocation Training On-Going 356,782.65 Gesima Feedback
BITICHA POLYTECHNIC Education and Vocation Training On-Going 835,815.00 Rigoma Feedback
GESIMA POLYTECHNIC Education and Vocation Training On-Going 1,801,120.60 Gesima Feedback
ST. PETERS GETENI POLYTECHNIC Education and Vocation Training On-Going 2,001,774.30 Rigoma Feedback
KIIOGOTWA POLYTECHNIC Education and Vocation Training On-Going 1,971,849.10 Manga Feedback
GESIGORO POLYTECHNIC Education and Vocation Training On-Going 1,801,152.30 Bokeira Feedback
BIGEGE POLYTECHNIC Education and Vocation Training On-Going 1,722,592.00 Bosamaro Feedback
KEROKA MARKET Trade, Tourism and Co-operative Development Completed 24,099,139.00 Rigoma Feedback
MONG’ONI POLYTECHNIC Education and Vocation Training Completed 2,006,840.60 Rigoma Feedback
GIRANGO MARKET Trade, Tourism and Co-operative Development Completed 11,230,686.50 Gachuba Feedback
REFURBISHMENT OF NYAMIRALEVEL 4 HOSPITAL MAIN GATE CGN/149/2013-14 Improved infrustructure Health Services Completed 7,680,831.54 Township Feedback
MARIBA YOUTH POLYTECHNIC Education and Vocation Training Completed 2,427,926.20 Bosamaro Feedback
KIOGE MKT TOILET Trade, Tourism and Co-operative Development Completed 804,170.00 Feedback
OUTPATIENT BLOCK AT NYABOGOYE HEALTH FACILITY NYCG/Q114/2014-2015 Improved infrustructure Health Services Completed 3,985,551.20 Rigoma Feedback
NYAMUSI MKT TOILET Trade, Tourism and Co-operative Development Completed 739,123.00 Bokeira Feedback
OUTPATIENT BLOCK AT NYANGORI HEALTH FACILITY NYCG/Q115/2014-2015 Improved infrustructure Health Services Completed 3,956,006.00 Rigoma Feedback
BOBEMBE YOUTH POLYTECHNIC Education and Vocation Training Completed 2,550,271.60 Bogichora Feedback
ITIBO MKT TOILET Trade, Tourism and Co-operative Development Completed 726,531.20 Itibo Feedback
MATERNITY BLOCK AT KIANGOSO HEALTH FACILITY NYCG/Q117/2014-2015 Improved infrustructure Health Services Completed 3,913,504.00 Kemera Feedback
ST. ANDREWS KEREMA POLYTECHNIC Education and Vocation Training Completed 2,565,363.20 Kiabonyoru Feedback
MAKAIRO MKT TOILET Trade, Tourism and Co-operative Development Completed 739,964.00 Bogichora Feedback
MATERNITY BLOCK AT KIANUNGU HEALTH FACILITY NYCG/Q118/2014-2015 Improved infrustructure Health Services Completed 3,994,261.60 Bosamaro Feedback
TOMBE MKT TOILET Trade, Tourism and Co-operative Development Completed 765,036.00 Manga Feedback
MATERNITY BLOCK AT NYAIGESA HEALTH FACILITY NYCG/Q140/2014-2015 Improved infrustructure Health Services Completed 3,800,803.80 Nyamaiya Feedback
MANGA DEB PRIMARY ECD CLASSROOM Education and Vocation Training Completed 2,812,848.04 Esise Feedback
NYARAMBA MKT TOILET Trade, Tourism and Co-operative Development Completed N/A Kiabonyoru Feedback
MATERNITY BLOCK AT MOKOMONI HEALTH FACILITY NYCG/Q142/2014-2015 Improved infrustructure Health Services Completed 3,806,603.80 Kiabonyoru Feedback
MAKAIRO DEB PRIMARY ECD CLASSROOM Education and Vocation Training Completed 2,853,981.00 Bogichora Feedback
KEGOGI MKT TOILET Trade, Tourism and Co-operative Development Completed 726,973.20 Kiabonyoru Feedback
CONSTRUCTION OF MATERNITY BLOCK AT BOMBAGI HEALTH FACILITY NYCG/Q080/2015 - 2016 Improved infrustructure Health Services Completed 3,800,593.00 Township Feedback
NYAKONGO PRIMARY ECD CLASSROOM Education and Vocation Training Completed 2,735,998.04 Manga Feedback
NYARONDE MKT TOILET Trade, Tourism and Co-operative Development Completed 726,512.64 Nyansiongo Feedback
CONSTRUCTION OF OUT-PATIENT BLOCK AT RIAMONI HEALTH FACILITY NYCG/Q130/2015 - 2016 Improved infrustructure Health Services Completed 3,850,260.00 Rigoma Feedback
KENYERERE ECD CLASSROOM Education and Vocation Training Completed 2,751,096.60 Magwagwa Feedback
MOCHENWA MKT TOILET Trade, Tourism and Co-operative Development Completed 727,612.60 Gesima Feedback
CONSTRUCTION OF OUT-PATIENT BLOCK AT TINDERETI HEALTH FACILITY NYCG/Q153/2015 - 2016 Improved infrustructure Health Services Completed 3,960,200.00 Nyansiongo Feedback
NYANCHONORIA ECD CLASSROOM Education and Vocation Training Completed 2,978,516.00 Rigoma Feedback
BONYUNYU MKT TOILET Trade, Tourism and Co-operative Development Completed 748,870.00 Nyamaiya Feedback
CONSTRUCTION AND COMPLETION OF OPERATING THEATRE, X-RAY AND MATERNITY WARDS AT NYANSIONGO SUB-COUNTY HOSPITAL CGN/T074/2015-16 Improved infrustructure Health Services Completed 13,586,494.00 Nyansiongo Feedback
GESIMA MKT TOILET Trade, Tourism and Co-operative Development Completed 769,901.00 Gesima Feedback
Construction and Completion of 80 Bed Amenity Block with |Doctor’s Plaza at Nyamira County Referral Hospital CGN/T075/2015-16 Improved infrustructure Health Services Completed 142,319,154.20 Township Feedback
NYAGACHO PRIMARY ECD CLASSROOM Education and Vocation Training Completed 2,664,805.80 Mekenene Feedback
MIRUKA MKT TOILET Trade, Tourism and Co-operative Development Completed 826,256.40 Nyamaiya Feedback
CONSTRUCTION AND COMPLETION OF OPERATING THEATRE AT NYAMIRA COUNTY REFERRAL HOSPITAL CGN/T076/2015-16 Improved infrustructure Health Services Completed 18,154,731.00 Township Feedback
PROPOSED CONST. AND COMPLETION OF MANGA FENCE NYCG/Q339/2016-2017 Trade, Tourism and Co-operative Development Completed 2,571,383.00 Manga Feedback
PROPOSED COMPLETION OF ESANI SUB COUNTY HOSPITAL STALLED STORY BUILDING NYCG/Q285/2015-16 Improved infrustructure Health Services Completed 3,975,262.00 Rigoma Feedback
IBARA DOK PRIMARY ECD CLASSROOM Education and Vocation Training Completed 2,854,394.60 Kiabonyoru Feedback
PROPOSED CONST. AND COMPLETION OF MOKOMONI MARKET FENCE NYCG/Q340/2016-2017 Trade, Tourism and Co-operative Development Completed 2,084,847.70 Mekenene Feedback
CONSTRUCTION OF RIOTONYI OPD BLOCK NYCG/Q262/2015-2016 Improved infrustructure Health Services Completed 3,985,286.00 Gachuba Feedback
NYAKEORE PRIMARY ECD CLASSROOM Education and Vocation Training Completed 2,729,017.00 Bonyamatuta Feedback
PROPOSED CONST. AND COMPLETION OF MAGWAGWA MARKET FENCE NYCG/Q341/2016-2017 Trade, Tourism and Co-operative Development Completed 2,099,890.00 Magwagwa Feedback
PROPOSED COMPLETION KAMBINI OUTPAPIENT BLOCK NYCG/Q283/2015-2016 Improved infrustructure Health Services Completed 3,943,257.00 Gesima Feedback
INTERNET & INTERCOM CONNECTIVITY Finance ICT and Economic Planning Completed 1,856,649.60 Township Feedback
CONSTRUCTION OF NYAOBE HEALTH FACILITY NYCG/Q331/2015-2016 Improved infrustructure Health Services Completed 3,890,122.64 Bokeira Feedback
NYAMBOGO PRIMARY ECD CLASSROOM Education and Vocation Training Completed 2,853,981.00 Magombo Feedback
REFURBISHMENT TO ECM FINANCE'S OFFICE NYCG/Q065/2014-2015 Finance ICT and Economic Planning Completed 3,757,530.00 Township Feedback
PROPOSED COMPLETION OF SERE OUTPAPIENT BLOCK NYCG/Q334/2015-2016 Improved infrustructure Health Services Completed 3,150,000.00 Bomwagamo Feedback
RENOVATION OF KITCHEN AND DINING HALL AT KIENDEGE HIGH SCHOOL NYCG/Q124/2015-2016 Gender, Youth, Sports, Culture and Social Services Completed 1,394,633.00 Kemera Feedback
PROPOSED COMPLETION OF NYAKEGOGI DISPENSARY NYCG/Q335/2015-2016 Improved infrustructure Health Services Completed 3,890,302.20 Kemera Feedback
RENOVATION OF BOYS DORMITORY, GIRLS DORMITORY AND 8NO. CLASSROOMS AT KIENDEGE HIGH SCHOOL NYCG/Q125/2015-2016 Gender, Youth, Sports, Culture and Social Services Completed 2,219,207.60 Kemera Feedback
PROPOSED COMPLETION OF OUT PATIENT BLOCK GATUTA HEALTH CENTRE NYCG/Q440/2015-2016 Improved infrustructure Health Services Completed 3,890,900.00 Magombo Feedback
SUPPLY OF TOOLS AND EQUIPMENTS NYCG/Q210/2015-2016 Gender, Youth, Sports, Culture and Social Services Completed 1,635,000.00 Kemera Feedback
Proposed Construction and Completion of Inpatient wards with operaing Theater block at Magwagwa Health Facility Improved infrustructure Health Services Completed 64,551,975.80 Magwagwa Feedback
RENOVATION OF HRM OFFICE/ REGISTRY OFFICE WING NYCG/Q083/ 2015 - 2016 Public Service Management Completed 1,199,629.00 Township Feedback
NYAMAURO PRIMARY ECD CLASSROM Education and Vocation Training Completed 2,500,013.44 Itibo Feedback
RENOVATIONOF PACDU OFFICE COUNTY HEADQUARTERS Public Service Management Completed 2,218,511.60 Township Feedback
Proposed Construction and Completion of Inpatient wards at Gesima Sub County Hospital Improved infrustructure Health Services Completed 34,999,235.00 Gesima Feedback
RENOVATION OF CHIEF'S CAMP Public Service Management Completed 3,699,020.00 Township Feedback
Proposed Construction and Completion of Inpatient wards at Nyamusi Sub County Hospital Improved infrustructure Health Services Completed 34,865,540.00 Bokeira Feedback
RENOVATION OF DEPUTY COMMISIONER'S OFFICE Public Service Management Completed 1,200,832.00 Township Feedback
Supply and Delivery of a Stand by Generator Set at Nyamira County Referral Hospital Improved infrustructure Health Services Completed 9,300,000.00 Township Feedback
CONSTRUCTION OF STORE AND TOILET BLOCK Public Service Management Completed 3,944,098.40 Township Feedback
Proposed Construction and Completion of Inpatient wards block at Nyabweri Health Facility Improved infrustructure Health Services Completed 13,239,878.08 Bomwagamo Feedback
Construction of Nyamusi market Material recovery facility Environment, Water, Energy, Mining and Natural Resources Completed 1,249,544.75 Bokeira Feedback
Costruction and Complition of twin staff house with two No.door pit latrine at Kambini health facility Improved infrustructure Health Services Completed 3,518,800.00 Gesima Feedback
CONST. OF ECDE CENTRE AT EGETONTO PRI. SCH. NYCG/Q174/2015-2016 Education and Vocation Training Completed 3,914,385.00 Bokeira Feedback
CONST. OF ECDE CENTRE AT RIAGECHURE PRI. SCH. NYCG/Q175/2015-2016 Education and Vocation Training Completed 3,559,953.00 Magombo Feedback
Restoration of Suguta Wetland Agriculture, Livestock and Fisheries Completed 8,066,986.00 Magwagwa Feedback
Costruction and Complition of twin staff house with two No.door pit latrine at Kenyamware health facility Improved infrustructure Health Services Completed 3.00 Magombo Feedback
Costruction and Complition of twin staff house with two No.door pit latrine at Kiangombe health facility Improved infrustructure Health Services Completed 3,574,377.60 Itibo Feedback
Construction and Completion of maternity block at Motontera dispensary Improved infrustructure Health Services Completed 3,620,684.80 Bomwagamo Feedback
Construction of Kebirigo market Material recovery facility Agriculture, Livestock and Fisheries Completed 1,248,998.39 Bonyamatuta Feedback
Construction and completion of Maternity block at Orwaki Health Centre Improved infrustructure Health Services Completed 3,505,897.00 Bokeira Feedback
Construction of Keroka Material recovery facility Agriculture, Livestock and Fisheries Completed 1,240,412.01 Rigoma Feedback
Construction and completion of OPD Block with Two number Pit latrine at Ribaita Health Centre Improved infrustructure Health Services Completed 3,802,665.00 Nyansiongo Feedback
Construction of Nyansiongo business centre Material recovery facility Agriculture, Livestock and Fisheries Completed 1,245,152.74 Nyansiongo Feedback
Construction and completion of twin staff house with two number door pit latrine at Nyagacho Improved infrustructure Health Services Completed 3,986,142.80 Mekenene Feedback
Construction and completion of twin staff house with two number door pit latrine at Nyamaiya Health Centre Improved infrustructure Health Services Completed 3,334,090.00 Nyamaiya Feedback
Establishment of Nyamira North sub county indigenous tree nursery Agriculture, Livestock and Fisheries Completed 2,990,147.17 Ekerenyo Feedback
Construction and completion of OPD with two number door pit latrine at Ikobe Health Centre Improved infrustructure Health Services Completed 3,630,486.80 Manga Feedback
Construction and completion of twin staff house with two number door pit latrine at Kianginda Health Centre Improved infrustructure Health Services Completed 3,619,200.00 Magombo Feedback
Construction and completion of OPD Block with two number door pit latrine at Nyamwanga Health Centre Improved infrustructure Health Services Completed 3,524,845.60 Magombo Feedback
Establishment of Masaba North sub county indigenous tree nursery Agriculture, Livestock and Fisheries Completed 2,998,397.00 Rigoma Feedback
Proposed Construction and completion to OPD block with two no.door pit latrine at Esianyi Health F acility Improved infrustructure Health Services Completed 3,999,997.80 Bokeira Feedback
Proposed Completion to Esani Sub County Hospital stalled story Building Phase4 Improved infrustructure Health Services Completed 3,982,059.60 Gesima Feedback
Proposed Construction and Completion of Inpatient Wards at Amatierio Health Facility Improved infrustructure Health Services Completed 14,716,807.20 Kiabonyoru Feedback
Proposed Construction and Completion of Inpatient Wards at Kiangoso Health Facility Improved infrustructure Health Services Completed 14,567,000.00 Kemera Feedback
CONST. OF ECDE CENTRE AT EKORO PRI. SCH. NYCG/Q258/2015-2016 Education and Vocation Training Completed 3,810,527.60 Bosamaro Feedback
Ekegoro Borehole Water drilling and Casing project. Water, Sanitation, and Irrrigation Completed 2,404,970.00 Magwagwa Feedback
Proposed Construction and Completion of Maternity Block at Mongoni Health Facility Improved infrustructure Health Services Completed 3,355,732.50 Rigoma Feedback
LOCAL AREA NETWORK CONNECTION NYCG/Q271/2015-2016 Education and Vocation Training Completed 2,940,310.00 Township Feedback
PROVISION OF BULK SMS OVER INTERNET PROTOCOL NYCG/Q271.A/2015-2016 Education and Vocation Training Completed 1,999,840.00 Township Feedback
Proposed Construction and Completion of OPD Block with two number door pit Latrine at Bobembe Health Facility Improved infrustructure Health Services Completed 3,330,402.80 Bogichora Feedback
Proposed Construction and Completion of OPD Block with two number door pit Latrine at Nyaobe Health Facility Improved infrustructure Health Services Completed 3,575,416.20 Bokeira Feedback
Proposed Construction and Completion of OPD Block with two number door pit Latrine at Geseneno Health Facility Improved infrustructure Health Services Completed 3,305,162.80 Township Feedback
Proposed Construction and Completion of OPD Block with two No.door pit latrine at Bomorito Health Facility Improved infrustructure Health Services Completed 3,977,834.88 Nyamaiya Feedback
INSTALLATION OF HEALTH MANAGEMENT INFORMATION SYSTEM {HMIS} Health Services Completed 5,449,500.00 Township Feedback
Proposed construction and completion of OPD Block with two No.door pit latrine at Nyanchoka Health Facility Improved infrustructure Health Services Completed 3,654,423.40 Kiabonyoru Feedback
REHABILITATION OF LEVEL 4 HOSPITAL KITCHEN Health Services Completed 13,827,136.20 Township Feedback
Proposed Construction and Completion of out patient block with two No. door pit latrine at Bobaracho haelth facility Improved infrustructure Health Services Completed 3,999,946.80 Bogichora Feedback
REHABILITATION OF LEVEL 4 HOSPITAL PLUMBING Health Services Completed 14,406,712.80 Township Feedback
ESIENYI H/C Health Services Completed 3,343,967.00 Bokeira Feedback
Renovation of Nyangena Health Facility Improved infrustructure Health Services Completed 14,323,210.00 Manga Feedback
KAMBINI H/C Health Services Completed 2,104,690.10 Gesima Feedback
Renovation of Kenyenya Health Facility Improved infrustructure Health Services Completed 13,248,360.00 Bonyamatuta Feedback
KENYORO H/C Health Services Completed 1,601,149.00 Itibo Feedback
Renovation of Magombo Health Facility Improved infrustructure Health Services Completed 11,904,540.00 Magombo Feedback
MOTAGARA H/C Health Services Completed 3,263,207.00 Bosamaro Feedback
Renovation of Kerobo Health Facility Improved infrustructure Health Services Completed 7,925,120.00 Kiabonyoru Feedback
NYAGACHO H/C Health Services Completed 1,501,208.72 Mekenene Feedback
Renovation of Machururiati Health Facility Improved infrustructure Health Services Completed 13,550,905.00 Gesima Feedback
NYAIGUTA H/C Health Services Completed Gesima Feedback
Renovation of Chepng'ombe Health Facility Improved infrustructure Health Services Completed 12,005,806.00 Esise Feedback
NYANCHONORIA H/C Health Services Completed 711,080.00 Rigoma Feedback
Rehabilitation of Drive Way and Parking at Nyamira County Referral Hospital Improved infrustructure Health Services Completed 18,126,920.00 Township Feedback
NYANDOCHE IBERE H/C Health Services Completed 2,797,340.00 Nyansiongo Feedback
NYANSABAKWA H/C Health Services Completed 2,347,352.34 Nyamaiya Feedback
NYARONDE H/C Health Services Completed 1,819,146.80 Nyansiongo Feedback
NYANSAGIO H/C Health Services Completed 1,140,581.60 Nyamaiya Feedback
ORWAKI H/C Health Services Completed Bokeira Feedback
RIGOMA H/C Health Services Completed 2,050,224.81 Rigoma Feedback
Construction of Toilet and Refurbishing of Nyabonge Dispensary Improved infrustructure Health Services Completed 4,999,999.00 Itibo Feedback
RIKENYE H/C Health Services Completed 962,220.58 Rigoma Feedback
SERE H/C Health Services Completed 1,704,028.40 Ekerenyo Feedback
GIANCHORE H/C Health Services Completed 2,411,251.20 Bogichora Feedback
Completion of Staff House and Fencing at Isicha Health Facility Improved infrustructure Health Services Completed 2,499,815.00 Kiabonyoru Feedback
RIANYAMBWEKE H/C Health Services Completed 3,214,870.40 Bomwagamo Feedback
IKOBE H/C Health Services Completed Manga Feedback
KEGINGA DISP Health Services Completed 3,407,088.20 Mekenene Feedback
Proposed construction and completion of Manga Stadium Sports/Football Pitch and Running Truck Improved infrustructure Gender, Youth, Sports, Culture and Social Services Completed 20,301,660.54 Manga Feedback
ENSOKO DISP Health Services Completed 1,305,731.38 Esise Feedback
Construction and completion of ECDE Classroom at Kenyoro Primary in Esise Ward Improved infrustructure Education and Vocation Training Completed 3,999,500.00 Esise Feedback
COMPLETION OF STAFF HOUSE AT NYAKONGO DISP Health Services Completed 3,598,795.42 Kiabonyoru Feedback
Construction and completion of ECDE Classroom at Ritibo Primary in Gesima Ward Improved infrustructure Education and Vocation Training Completed 3,498,159.80 Gesima Feedback
MOKOMONONI H/C Health Services Completed Kiabonyoru Feedback
Construction and completion of ECDE Classroom at Omobiro Primary in Bokeira Ward Improved infrustructure Education and Vocation Training Completed 3,498,159.80 Bokeira Feedback
MOCHENWA H/C Health Services Completed 3,404,580.60 Gesima Feedback
Construction and completion of ECDE Classroom at Simbauti Primary in Nyansiongo Ward Improved infrustructure Education and Vocation Training Completed 3,196,922.00 Nyansiongo Feedback
EMENYENCHE H/C Health Services Completed 2,535,067.48 Gesima Feedback
Construction and completion of ECDE at Kenyoro Primary in Itibo Ward Improved infrustructure Education and Vocation Training Completed 3,180,190.00 Itibo Feedback
RIGOKO DISP Health Services Completed 1,170,196.40 Nyansiongo Feedback
Proposed Construction of water Tank & Distribution of water from Ribariri Water Project in Magwagwa Ward Improved Water Supply Water, Sanitation, and Irrrigation Completed 4,979,053.27 Magwagwa Feedback
MONGORISI DISP Health Services Completed 3,709,987.40 Bogichora Feedback
Proposed Equipping and Distribution of Tonga Omonuri Borehole in Nyamaiya Ward Improved Water Supply Water, Sanitation, and Irrrigation Completed 3,644,966.42 Nyamaiya Feedback
GIRANGO DISP Health Services Completed 4,118,600.00 Gachuba Feedback
Proposed Rehabilitation of Obwari Borehole in Ekerenyo Ward Improved Water Supply Water, Sanitation, and Irrrigation Completed 1,199,225.16 Ekerenyo Feedback
TINDERETI DISP Health Services Completed Nyansiongo Feedback
Proposed Rehabilitation of Nyangena Borehole in Bosamaro Ward Improved Water Supply Water, Sanitation, and Irrrigation Completed 1,496,268.75 Bosamaro Feedback
RAITIGO DISP Health Services Completed 1,496,091.44 Esise Feedback
Proposed Rehabilitation of Gesure Borehole in Manga Ward Improved Water Supply Water, Sanitation, and Irrrigation Completed 1,499,995.00 Manga Feedback
KIENDEGE DISP Health Services Completed 3,697,981.40 Kemera Feedback
Proposed Construction and Protection of Water Springs in Itibo Ward Improved Water Supply Water, Sanitation, and Irrrigation Completed 4,944,823.00 Itibo Feedback
ISOGE DISP Health Services Completed 3,838,242.80 Esise Feedback
Proposed Construction and Protection of Water Springs in Bokeira Ward Improved Water Supply Water, Sanitation, and Irrrigation Completed 3,955,858.40 Bokeira Feedback
NYABWERI Health Services Completed 2,306,149.60 Bomwagamo Feedback
Restoration of Gesebei dam Improved Water Supply Environment, Water, Energy, Mining and Natural Resources Completed 4,496,928.67 Feedback
BOSIANGO Health Services Completed 1,657,060.00 Bosamaro Feedback
Construction of Kebirigo market Material recovery facility Waste Management Environment, Water, Energy, Mining and Natural Resources Completed 1,248,998.39 Bonyamatuta Feedback
KIAMANYOMBA Health Services Completed Magwagwa Feedback
Construction of Keroka Material recovery facility Waste Management Environment, Water, Energy, Mining and Natural Resources Completed 1,240,412.01 Rigoma Feedback
MOSOBETI Health Services Completed 2,484,946.00 Gesima Feedback
Construction of Ikonge market Material recovery facility Waste Management Environment, Water, Energy, Mining and Natural Resources Completed 1,249,956.38 Ekerenyo Feedback
MOTONTERA Health Services Completed 1,409,724.80 Nyamaiya Feedback
Construction of Nyansiongo business centre Material recovery facility Waste Management Environment, Water, Energy, Mining and Natural Resources Completed 1,245,152.74 Nyansiongo Feedback
ENDIBA Health Services Completed 2,783,014.00 Kiabonyoru Feedback
Construction of Miruka market Material recovery facility Waste Management Environment, Water, Energy, Mining and Natural Resources Completed 1,249,860.56 Nyamaiya Feedback
NYAKEGOGI Health Services Completed 2,036,414.80 Kemera Feedback
Construction of Kemera market Material recovery facility Waste Management Environment, Water, Energy, Mining and Natural Resources Completed 1,201,412.72 Kemera Feedback
KERUMBE Health Services Completed 2,529,059.00 Mekenene Feedback
Establishment of Nyamira North sub county indigenous tree nursery Afforestation Environment, Water, Energy, Mining and Natural Resources Completed 2,990,147.17 Ekerenyo Feedback
NYANKONO Health Services Completed 1,562,025.00 Mekenene Feedback
Establishment of Nyamira South sub county indigenous tree nursery Afforestation Environment, Water, Energy, Mining and Natural Resources Completed 2,998,397.00 Township Feedback
RIAKINARO Health Services Completed 1,846,781.48 Bonyamatuta Feedback
Establishment of Borabu sub county indigenous tree nursery Afforestation Environment, Water, Energy, Mining and Natural Resources Completed 2,998,803.37 Nyansiongo Feedback
KENYENYA Health Services Completed 1,536,306.32 Bonyamatuta Feedback
Establishment of Masaba North sub county indigenous tree nursery Afforestation Environment, Water, Energy, Mining and Natural Resources Completed 2,998,397.00 Rigoma Feedback
NYAGANCHA Health Services Completed 1,248,165.80 Gachuba Feedback
Establishment of Manga sub county indigenous tree nursery Afforestation Environment, Water, Energy, Mining and Natural Resources Completed 2,999,116.66 Manga Feedback
MAGWAGWA Health Services Completed Magwagwa Feedback
Construction of Nyamus market Material recovery facility Waste Management Environment, Water, Energy, Mining and Natural Resources Completed 1,249,544.75 Bokeira Feedback
NYANGWETA Health Services Completed 2,523,660.00 Bosamaro Feedback
Ekegoro Borehole Water drilling and Casing project. Improved Water Supply Environment, Water, Energy, Mining and Natural Resources Completed 2,404,970.00 Ekerenyo Feedback
KEMUNCHUGU Health Services Completed 2,576,857.35 Bokeira Feedback
Equipping and Distribution of Ekegoro Borehole Project Improved Water Supply Environment, Water, Energy, Mining and Natural Resources Completed 3,999,680.00 Ekerenyo Feedback
KENYERERE Health Services Completed 2,228,226.00 Bonyamatuta Feedback
Proposed Rehabilitation of Kenyerere Borehole Improved Water Supply Environment, Water, Energy, Mining and Natural Resources Completed 1,142,942.78 Magwagwa Feedback
ETURUNGI Health Services Completed 1,741,538.74 Kiabonyoru Feedback
Proposed Rehabilitation of Marani Borehole Improved Water Supply Environment, Water, Energy, Mining and Natural Resources Completed 1,405,181.40 Feedback
IKONGE Health Services Completed 1,354,010.00 Itibo Feedback
MIRIRI Health Services Completed 1,775,887.20 Gachuba Feedback
REHABILITATION AND REPAIR OF KEROKA BUS PARK Roads, transport, public works and Disaster Management Completed 15,835,160.00 Rigoma Feedback
MANGA SUB COUNTY Health Services Completed 1,946,426.00 Manga Feedback
REHABILITATION AND REPAIR OF ACCESS ROAD PARKING Roads, transport, public works and Disaster Management Completed 6,402,330.00 Township Feedback
MECHEO Health Services Completed 437,436.00 Kiabonyoru Feedback
COMPLETION OF NYAMIRA COUNTY COUNCIL PHASE - II Roads, transport, public works and Disaster Management Completed 18,443,043.00 Township Feedback
TING’A Health Services Completed 2,492,943.20 Bosamaro Feedback
TOMBE Health Services Completed 609,000.00 Manga Feedback
AMAKARA,NYARONDE ,KONA C, RIAMANOTI- UR 52 Roads, transport, public works and Disaster Management Completed 9,559,560.00 Nyansiongo Feedback
MAGOMBO GUCHA Health Services Completed 1,722,837.00 Gachuba Feedback
RIAMOSETI,RIOBWOCHA CONSTRUCTION & MAINTAINANCE (UR 23) Roads, transport, public works and Disaster Management Completed 3,245,416.50 Mekenene Feedback
ETONO Health Services Completed 1,685,403.50 Bomwagamo Feedback
MWONGORI MKRT,RIONSONGO ROAD UR-22 Roads, transport, public works and Disaster Management Completed 4,484,066.00 Mekenene Feedback
CHINA Health Services Completed 1,413,819.60 Itibo Feedback
GUCHA-MARIBA JUNC-NYASWAGO JUNC-AVACADO-MOKOMONI UR-62 Roads, transport, public works and Disaster Management Completed 9,011,614.40 Kiabonyoru Feedback
SIRATE Health Services Completed 1,067,942.34 Magombo Feedback
MAGOMBO H/C Health Services Completed 1,154,379.00 Magombo Feedback
ETANGI-NYANSAKIA SDA/TBC-MEBENO PRY. SCHOOL-RIOMBATI JUCTN UR-43 Roads, transport, public works and Disaster Management Completed 11,770,080.00 Esise Feedback
EKERENYO Health Services Completed 764,398.00 Ekerenyo Feedback
KEROKA-KIERIRA-RIKENYE UR-53 Roads, transport, public works and Disaster Management Completed 4,799,833.20 Rigoma Feedback
KIANGOSO DISP Health Services Completed Kemera Feedback
KEROKA POSTA-NYASORE ACADEMY-METAMANYWA UR-55 Roads, transport, public works and Disaster Management Completed 8,430,300.00 Rigoma Feedback
KIOMARA DISP Health Services Completed 1,602,979.18 Magombo Feedback
KIENDEGE-CHARARA-NYAGECHECHE UR-28 Roads, transport, public works and Disaster Management Completed 8,302,750.00 Kemera Feedback
AMATERIO DISP Health Services Completed 3,145,628.00 Kiabonyoru Feedback
NYABONGE DISP Health Services Completed 1,723,579.04 Itibo Feedback
TOMBE-NYAGUKU-MIRIRI-GEKANO TBC UR-1 Roads, transport, public works and Disaster Management Completed 6,381,562.00 Magombo Feedback
REFURBISHMENT OF NYAMIRALEVEL 4 HOSPITAL MAIN GATE CGN/149/2013-14 Health Services Completed 7,680,831.54 Township Feedback
REVERSE OSMOSIS WATER TREATMENT SYSTEM Health Services Completed 3,350,000.00 Township Feedback
RIAKWORO-RISA ESANI-KEBUKO-GESABAKWA UR-6 Roads, transport, public works and Disaster Management Completed 2,388,878.20 Gesima Feedback
INSTALLATION OF ELECTRICAL CABLING IN THE NCH CT SCAN ROOM NYCG/Q04/ 2014-2015 Health Services Completed 3,091,400.00 Township Feedback
RITONGO-MATUTU-IRANYA UR-7 Roads, transport, public works and Disaster Management Completed 9,148,689.67 Gesima Feedback
NYAMWETUREKO H F NYCG/Q051/2014-2015 Health Services Completed 2,392,140.40 Township Feedback
GEKANO TBC-KEGOGI TBC-NYAKEMOGWA SDA-ERONGE SDA UR-37 Roads, transport, public works and Disaster Management Completed 6,585,640.02 Gachuba Feedback
MEDICAL EQUIPMENTS AND TOOLS FOR CT SCAN ROOM. (Holley Cotec) Health Services Completed 735,800.00 Township Feedback
MOTURUMESI-RIABAKA-GETENI-KEBOBA-KIOMOSO UR-38 Roads, transport, public works and Disaster Management Completed 1,985,410.00 Gachuba Feedback
LABORATORY EQUIPMENTS ( Science Scope Ltd) Health Services Completed 1,110,000.00 Township Feedback
RIABOTO-BIGOGO UR-31 Roads, transport, public works and Disaster Management Completed 4,454,405.18 Manga Feedback
LABORATORY EQUIPMENTS (Divine Agents) Health Services Completed Township Feedback
NYAKARANGA JUNC-KEBOBORA-NYAKARANGA PRI.-OMOBIRO UR-4 Roads, transport, public works and Disaster Management Completed 9,004,643.44 Bokeira Feedback
LABORATORY EQUIPMENTS ( Crown Solutions) Health Services Completed 3,616,250.00 Township Feedback
ORWAKI BR-NYAMUSI-EGOTOTO UR-5 Roads, transport, public works and Disaster Management Completed 1,627,765.00 Bokeira Feedback
LABORATORY EQUIPMENTS (Faram E. A Ltd) Health Services Completed 9,574,146.21 Township Feedback
EKONA-NYAGEKOBOKOBO-MAGENA MARABU-ESERETI-BISEMBE UR-19 Roads, transport, public works and Disaster Management Completed 8,167,646.90 Magwagwa Feedback
LABORATORY EQUIPMENTS (Holley Cotec) Health Services Completed Township Feedback
MATORORA-ISINTA-CHINA-NYASIO-OMOKIRONDO UR-20 Roads, transport, public works and Disaster Management Completed 8,194,421.00 Itibo Feedback
LABORATORY EQUIPMENTS (Hass Scientific) Health Services Completed Township Feedback
EKERENYO-KIEMUMA-NYAMEKO UR-40 Roads, transport, public works and Disaster Management Completed 8,212,858.00 Ekerenyo Feedback
AMBULANCE Health Services Completed 8,000,000.00 Township Feedback
THREATRE EQUIPMENT AND SURGICAL INSTRUMENTS () Health Services Completed 3,350,000.00 Township Feedback
THREATRE EQUIPMENT AND SURGICAL INSTRUMENTS (Holley Cotec E. A) Health Services Completed 4,962,000.00 Township Feedback
BWONYANGI-IKONGE DISPENSARY-BONYAMORITO UR-34 Roads, transport, public works and Disaster Management Completed 4,745,225.00 Nyamaiya Feedback
THREATRE EQUIPMENT AND SURGICAL INSTRUMENTS (Nairobi Enterprise) Health Services Completed Township Feedback
GESERO-GESIAGA SEC-BOKAYA-EKERUBO-SIRONGA UR-8 Roads, transport, public works and Disaster Management Completed 6,741,618.00 Bosamaro Feedback
THREATRE EQUIPMENT AND SURGICAL INSTRUMENTS (Njimia Pharmaceuticals) Health Services Completed Township Feedback
NYABITE-NYANGOSO-NYAIRICHA-BOBONDO-KEBIRIGO UR-50 Roads, transport, public works and Disaster Management Completed 9,716,642.22 Township Feedback
THREATRE EQUIPMENT AND SURGICAL INSTRUMENTS (Spenomatic Kenya Ltd) Health Services Completed 8,500,000.00 Township Feedback
THREATRE EQUIPMENT AND SURGICAL INSTRUMENTS (A1 Healthcare Ltd) Health Services Completed Township Feedback
NYABITE-RANGENYO-NYAKUNGURU-BONYUNYU UR-17 Roads, transport, public works and Disaster Management Completed Nyamaiya Feedback
TWO NO. DIALYSIS MACHINES (Crown Health Care) NYCG/Q135/2014 -2015 Health Services Completed 3,364,000.00 Township Feedback
MATERNITY BLOCK AT KIANGOSO HEALTH FACILITY NYCG/Q117/2014-2015 Health Services Completed Kemera Feedback
NYACHURURU - NYANGENA-TBC UR 10 Roads, transport, public works and Disaster Management Completed 4,591,767.80 Bosamaro Feedback
MATERNITY BLOCK AT KIANUNGU HEALTH FACILITY NYCG/Q118/2014-2015 Health Services Completed 3,994,261.60 Bosamaro Feedback
NYAMOKERI–EMONGA UR 35 Roads, transport, public works and Disaster Management Completed 2,846,830.00 Bogichora Feedback
STAFF QUARTERS AND FENCING OF OGANGO HEALTH FACILITY NYCG/Q120/2014-2015 Health Services Completed 1,647,414.60 Manga Feedback
KEBIRIGO-KABATIA-RIAMASARE-BOKIMO-KENYENYA-UR-11B Roads, transport, public works and Disaster Management Completed 5,292,932.00 Bonyamatuta Feedback
RENOVATION WORKS IKOBE HEALTH FACILITY NYCG/Q124/2014-2015 Health Services Completed Manga Feedback
NYAMIRA LEVEL 5 HOSPITAL CASUALITY BLOCK NYCG/Q125/2014-2015 Health Services Completed 1,255,763.80 Township Feedback
NYAMIRA LEVEL 5 HOSPITAL MATERNITY BLOCK NYCG/Q136/2014-2015 Health Services Completed 3,384,769.80 Township Feedback
RIAGISEMBE FOOTBRIDGE CGN/T019/2014-2015 Roads, transport, public works and Disaster Management Completed 4,529,034.00 Gachuba Feedback
NYAMIRA LEVEL 5 HOSPITAL AMENITY BLOCK NYCG/Q137/2014-2015 Health Services Completed Township Feedback
RIAGWARO FOOTBRIDGE CGN/T020/2014-2015 Roads, transport, public works and Disaster Management Completed 4,259,785.64 Bokeira Feedback
MATERNITY BLOCK AT MOKOMONI HEALTH FACILITY NYCG/Q142/2014-2015 Health Services Completed 3,382,490.00 Kiabonyoru Feedback
KAAGWA FOOTBRIDGE CGN/T021/2014- 2015 Roads, transport, public works and Disaster Management Completed 5,155,199.50 Nyansiongo Feedback
SUPPLY AND DELIVERY OF WATER PUMP NYCG/Q104/2015-2016 Health Services Completed 1,998,000.00 Township Feedback
ITONGO SENGERA BOX CULVERT CGN/T022/2014-15 Roads, transport, public works and Disaster Management Completed 7,070,061.00 Rigoma Feedback
CONSTRUCTION OF 2.NO PIT LATRINES AT MACHURURIATI DESPENSARY NYCG/Q008/2015 - 2016 Health Services Completed Rigoma Feedback
RIAPIMA BRIDGE AND APPROACH ROAD CGN/T023/2014-2015 Roads, transport, public works and Disaster Management Completed 16,457,549.01 Bogichora Feedback
CONSTRUCTION OF OUT-PATIENT BLOCK AT NYAGACHO HEALTH FACILITY NYCG/Q033/2015 - 2016 Health Services Completed 1,960,930.12 Kiabonyoru Feedback
RIASAGWE FOOTBRIDGE CGN/T024/2014-2015 Roads, transport, public works and Disaster Management Completed 4,212,014.75 Bogichora Feedback
CONSTRUCTION OF TOILET BLOCK AT NYAMAIRA LEVEL 4 HOSPITAL NYCG/Q049/2015 - 2016 Health Services Completed Township Feedback
NYAMACHE MAYA BOX CULVERT CGN/T025/2014-15 Roads, transport, public works and Disaster Management Completed 5,344,908.00 Township Feedback
COMPLETION OF LABORATORY BLOCK AT MANGA SUB-COUNTY DIST. HOSPITAL NYCG/Q050/2015 - 2016 Health Services Completed 2,209,742.00 Manga Feedback
Construction and Completion of 80 Bed Amenity Block with |Doctor’s Plaza at Nyamira County Referral Hospital CGN/T075/2015-16 Health Services Completed 16,201,361.56 Township Feedback
MULTI-PURPOSE FIRE ENGINE TRUCK Roads, transport, public works and Disaster Management Completed N/A Township Feedback
CONSTRUCTION AND COMPLETION OF OPERATING THEATRE AT NYAMIRA COUNTY REFERRAL HOSPITAL CGN/T076/2015-16 Health Services Completed 6,764,958.00 Township Feedback
TERMINAL FACILITY AT KEBIRIGO CGN/T043/2014/2015 Roads, transport, public works and Disaster Management Completed 9,700,475.74 Bonyamatuta Feedback
SUPPLY, DELIVERY, INSTALLATION, TESTING AND COMMISSIONING OF A 5-BED ICU UNIT AT NYAMIRA COUNTY REFERRAL HOSPITAL CGN/T080/2015-2016 Health Services Completed 19,308,400.00 Township Feedback
TERMINAL FACILTY AND BACKSTREET AT NYANSIONGO CGN/T044/2014/2015 Roads, transport, public works and Disaster Management Completed 4,640,718.00 Nyansiongo Feedback
SUPPLY & DELIVERY 5ICU VENTILATORS WITH TRAY, 5 PATIENT MONITOR, 5 INFUSION PUMP AND 5 SYRINGE PUMP, AT NYAMIRA COUNTY REFERRAL HOSPITAL CGN/T080/2015-2016 Health Services Completed Township Feedback
DEVELOPING AND UPGRADING OF CAR LOTS IN NYAMIRA COUNTY CGN/T045/2014-2015 Roads, transport, public works and Disaster Management Completed 9,765,939.20 Township Feedback
SUPPLY & DELIVERY OF 2 SEMIFOWLER ELECTRIC BED, EMERGENCY/ANASTHESIA TRAY AND 10 I.V POLES AT NYAMIRA COUNTY REFERRAL HOSPITAL CGN/T080/2015-2016 Health Services Completed Township Feedback
SUPPLY, DELIVERY, INSTALLATION, TESTING AND COMMISSIONING OF A MEDICAL OXYGEN GENERATING PLANT AT NYAMIRA COUNTY REFERRAL HOSPITAL CGN/T082/2015-2016 Health Services Completed Township Feedback
BACKSTREET AT KEROKA IN NYAMIRA COUNTY CGN/T047/2014-2015 Roads, transport, public works and Disaster Management Completed 7,375,024.58 Rigoma Feedback
SUPPLY OF MEDICAL EQUIPMENTS NYCG/Q246/2015-2016 Health Services Completed 2,780,000.00 Township Feedback
EGESIERI-NYABITE-FLORIDA ROAD 1.5 Km. Roads, transport, public works and Disaster Management Completed 2,374,785.00 Township Feedback
MAGWAGWA MARKET CGN/T031/2014-2015 Lands, Housing and Urban Development Completed 14,615,525.56 Magwagwa Feedback
NYAMWETUREKO-BONDENI ROAD-BONYAMATUTA ROAD Roads, transport, public works and Disaster Management Completed 3,015,285.00 Bonyamatuta Feedback
IKONGE MARKET CGN/T032/2014-2015 Lands, Housing and Urban Development Completed 10,269,278.16 Township Feedback
NYABARA IBERE-BOKIMO ROAD-BONYAMATUTA ROAD 2.4Km Roads, transport, public works and Disaster Management Completed 1,643,400.00 Bonyamatuta Feedback
NYAMIRA COUNTY KIOSKIS CGN/T033/2014-2015 Lands, Housing and Urban Development Completed N/A Township Feedback
MAGOMBO MARKET CGN/T034/2014-2015 Lands, Housing and Urban Development Completed 10,443,391.00 Magombo Feedback
MOSOBETI MARKET CGN/T035/2014-2015 Lands, Housing and Urban Development Completed 13,149,349.19 Gesima Feedback
BOX CULVERT AT RIANGWENYI Roads, transport, public works and Disaster Management Completed 1,533,220.00 Gesima Feedback
MOKOMONI MARKET CGN/T036/2014-2015 Lands, Housing and Urban Development Completed 14,632,790.00 Mekenene Feedback
REFURBSHMENT OF HOSPITAL STAFF QUARTERS Lands, Housing and Urban Development Completed 2,280,000.00 Township Feedback
RENOVATION OF OFFICE Lands, Housing and Urban Development Completed 1,537,580.00 Township Feedback
CONSTRUCTION OF SEPTIC TANK AT NYAMIRA DISTRICT HOSPITAL STAFF QUARTERS Lands, Housing and Urban Development Completed 1,823,024.05 Township Feedback
REPAIR & MAINTANANCE OF MOBAMBA CATHOLIC-BOMBWOBO-NYAKEMINCHA ROAD NYCG/KRB/Q310/2015-2016 Roads, transport, public works and Disaster Management Completed 1,997,995.00 Bonyamatuta Feedback
MOTOR CYCLE SHADE AT RAITIGO MKT NYCG/Q009/2015-2016 Lands, Housing and Urban Development Completed Esise Feedback
REPAIR & MAINTANANCE OF OTANYORE-ETONO-BONYUNYUNYCG/KRB/Q311/2015-2016 Roads, transport, public works and Disaster Management Completed 1,646,051.60 Bogichora Feedback
MOTOR CYCLE SHADES AT NYANDOCHE IBERE STAGE NYCG/Q010/2015-2016 Lands, Housing and Urban Development Completed Nyansiongo Feedback
MOTOR CYCLE SHADE AT MABARIRI NYCG/Q013/2015-2016 Lands, Housing and Urban Development Completed 173,994.13 Bomwagamo Feedback
REPAIR & MAINTANANCE OF MIRUKA-ATEMOROADNYCG/KRB/Q313/2015-2016 Roads, transport, public works and Disaster Management Completed 2,067,111.90 Nyamaiya Feedback
MOTOR CYCLE SHADE AT ISINTA MKT NYCG/Q014/2015-2016 Lands, Housing and Urban Development Completed 199,868.00 Itibo Feedback
REPAIR AND MAINTANANCE OF CO-OP BANK-SEN. KEBASO SEC SCH ROADNYCG/KRB/Q314/2015-2016 Roads, transport, public works and Disaster Management Completed 1,425,848.00 Township Feedback
MOTOR CYCLE SHADE AT EKERENYO STAGE NYCG/Q015/2015-2016 Lands, Housing and Urban Development Completed 189,613.00 Ekerenyo Feedback
REPAIR AND MAINTANANCE OF IKONGE-NYAORA-NYAMEKOBO ROADNYCG/KRB/Q315/2015-2016 Roads, transport, public works and Disaster Management Completed 2,088,128.00 Ekerenyo Feedback
MOTOR CYCLE SHADE AT IKONGE NYCG/Q015/2015-2016 Lands, Housing and Urban Development Completed 199,868.00 Ekerenyo Feedback
REPAIR & MAINTANANCE OF EKERENYO-KEBABE-KANYANCHA-METHODIST CHURCH-OMWAMBA-RIAMEKI ROAD NYCG/KRB/Q316/2015-2016 Roads, transport, public works and Disaster Management Completed 2,081,820.10 Itibo Feedback
MOTOR CYCLE SHADE AT MOTURUMESI NYCG/Q018/2015-2016 Lands, Housing and Urban Development Completed 198,302.00 Gachuba Feedback
REPAIR & MAINTANANCE OF ERONGE-KIOGE ROAD NYCG/KRB/Q317/2015-2016 Roads, transport, public works and Disaster Management Completed 1,615,137.60 Bomwagamo Feedback
MOTOR CYCLE SHADE AT GIRANGO NYCG/Q018/2015-2016 Lands, Housing and Urban Development Completed Gachuba Feedback
MOTOR CYCLE SHADE AT MABUNDU-BOBEMEBE JUNCTION NYCG/Q019/2015-2016 Lands, Housing and Urban Development Completed Bogichora Feedback
REPAIR & MAINTANANCE OF GESURA-IYWERO BRIDGEROADNYCG/KRB/Q319/2015-2016 Roads, transport, public works and Disaster Management Completed 2,859,472.50 Bokeira Feedback
MOTOR CYCLE SHADE AT TINGA MKT NYCG/Q020/2015-2016 Lands, Housing and Urban Development Completed Bosamaro Feedback
REPAIR & MAINTANANCE OF RIAMBAKA- RIASAGWEROADNYCG/KRB/Q320/2015-2016 Roads, transport, public works and Disaster Management Completed 1,737,426.25 Esise Feedback
MOTOR CYCLE SHADE AT NYABITE NYCG/Q022/2015-2016 Lands, Housing and Urban Development Completed Township Feedback
MOTOR CYCLE SHADE AT NYAMIRA STAGE 1. NYCG/Q022/2015-2016 (Vemac) Lands, Housing and Urban Development Completed 192,544.00 Township Feedback
REPAIR & MAINTANANCE OF NYABIOTO-KIABONYORU-NDURUMO-ONYASWAMU ROAD NYCG/KRB/Q322/2015-2016 Roads, transport, public works and Disaster Management Completed 2,879,999.88 Kiabonyoru Feedback
MOTOR CYCLE SHADE AT NYAMIRA STAGE 2. NYCG/Q022/2015-2016 (Hemoot) Lands, Housing and Urban Development Completed 194,532.00 Township Feedback
REPAIR & MAINTANANCE OF RIANYASANI-GESABAKWA-RIARATI ROAD NYCG/KRB/Q323/2015-2016 Roads, transport, public works and Disaster Management Completed 2,125,337.50 Esise Feedback
MOTOR CYCLE SHADE AT KEMERA STAGE NYCG/Q023/2015-2016 Lands, Housing and Urban Development Completed 185,400.00 Kemera Feedback
REPAIR AND MAINTANANCE OF MOCHENWA SOCIETY-MOCHENWA DISP.-RIAMARANGA-MOCHENWA PRI SCH ROAD NYCG/KRB/Q324/2015-2016 Roads, transport, public works and Disaster Management Completed 2,137,227.50 Gesima Feedback
MOTOR CYCLE SHADE AT OMOGONHORO STAGE NYCG/Q023/2015-2016 Lands, Housing and Urban Development Completed 200,868.00 Kemera Feedback
MOTOR CYCLE SHADE AT RIKURUMA NYCG/Q025/2015-2016 Lands, Housing and Urban Development Completed 175,055.00 Magwagwa Feedback
REPAIR AND MAINTANANCE OF GIRANGO CF JUNCTION-MASHAURI-RIANYASIMI- KEBIRICHI ROOCHE-RIAMOENGA-KEBOBA TBC-RIAMOSIGISI ROAD NYCG/KRB/Q326/2015-2016 Roads, transport, public works and Disaster Management Completed 2,687,306.00 Gachuba Feedback
MOTOR CYCLE SHADE AT MAGWAGWA MKT NYCG/Q025/2015-2016 Lands, Housing and Urban Development Completed 198,160.00 Magwagwa Feedback
REPAIR AND MAINTANANCE OF,RIASTEPHENE-BOGWENDO SEC SCH-RIOKENDO ROAD Roads, transport, public works and Disaster Management Completed 2,520,680.00 Magombo Feedback
MOTOR CYCLE SHADE AT NYAMAIYA NYCG/Q026/2015-2016 Lands, Housing and Urban Development Completed Nyamaiya Feedback
REPAIR AND MAINTANANCE OF NYAIKURO JUNCTION- GESURE ROAD NYCG/KRB/Q328/2015-2016 Roads, transport, public works and Disaster Management Completed 2,094,304.60 Manga Feedback
MOTOR CYCLE SHADES AT KONATE JUNCTION NYCG/Q027/2015-2016 Lands, Housing and Urban Development Completed Bonyamatuta Feedback
REPAIR AND MAINTANANCE OF OMOGONCHORO-KIOMAKONDO ROAD NYCG/KRB/Q329/2015-2016 Roads, transport, public works and Disaster Management Completed 1,789,917.00 Kemera Feedback
MOTOR CYCLE SHADE AT KEBIRIGO MARKET NYCG/Q027/2015-2016 (Cmos ) Lands, Housing and Urban Development Completed Bonyamatuta Feedback
PROVISION & SUPPLY OF MURRAM 15,000 METERS CUBIC NYCG/Q089/2016-2017 Roads, transport, public works and Disaster Management Completed 3,300,000.00 Bonyamatuta Feedback
MOTOR CYCLE SHADE AT NYAMUSI NYCG/Q028/2015-2016 Lands, Housing and Urban Development Completed Bokeira Feedback
PROVISION & SUPPLY OF MURRAM 20,000 METERS CUBIC NYCG/Q090/2016-2017 Roads, transport, public works and Disaster Management Completed 3,900,000.00 Bogichora Feedback
MOTOR CYCLE SHADE AT MANGA MKT NYCG/Q009/2015-2016 Lands, Housing and Urban Development Completed 174,754.00 Esise Feedback
PROVISION & SUPPLY OF MURRAM 16,500 METERS CUBIC NYCG/Q093/2016-2017 Roads, transport, public works and Disaster Management Completed 3,217,500.00 Township Feedback
MOTOR CYCLE SHADE AT AMAKARA NYCG/Q010/2015-2016 Lands, Housing and Urban Development Completed 179,336.00 Nyansiongo Feedback
PROVISION & SUPPLY OF MURRAM 15,000 METERS CUBIC NYCG/Q094/2016-2017 Roads, transport, public works and Disaster Management Completed 3,000,000.00 Esise Feedback
MOTOR CYCLE SHADE AT MWAMOGUSII JUNCTION NYCG/Q011/2015-2016 Lands, Housing and Urban Development Completed Mekenene Feedback
PROVISION & SUPPLY OF MURRAM 13,000 METERS CUBIC NYCG/Q095/2016-2017 Roads, transport, public works and Disaster Management Completed 2,795,000.00 Nyamaiya Feedback
MOTOR CYCLE SHADE AT CHEBILAT NYCG/Q011/2015-2016 Lands, Housing and Urban Development Completed Mekenene Feedback
PROVISION & SUPPLY OF MURRAM 17,000 METERS CUBIC NYCG/Q097/2016-2017 Roads, transport, public works and Disaster Management Completed 3,434,000.00 Bosamaro Feedback
MOTOR CYCLE SHADE AT GESIMA MKT NYCG/Q012/2015-2016 Lands, Housing and Urban Development Completed 178,524.00 Gesima Feedback
PROVISION & SUPPLY OF MURRAM 18,000 METERS CUBIC NYCG/Q098/2016-2017 Roads, transport, public works and Disaster Management Completed 3,240,000.00 Kemera Feedback
MOTOR CYCLE SHADE AT ESANI NYCG/Q012/2015-2016 Lands, Housing and Urban Development Completed Gesima Feedback
PROVISION & SUPPLY OF MURRAM 11,000 METERS CUBIC NYCG/Q100/2016-2017 Roads, transport, public works and Disaster Management Completed 2,200,000.00 Nyansiongo Feedback
MOTOR CYCLE SHADE AT ERONGE NYCG/Q013/2015-2016 Lands, Housing and Urban Development Completed Bomwagamo Feedback
MOTOR CYCLE SHADE AT TOMBE JUNCTION NYCG/Q014/2015-2016 Lands, Housing and Urban Development Completed 190,762.00 Itibo Feedback
TENTE BOREHOLE Water, Sanitation, and Irrrigation Completed 5,897,904.00 Township Feedback
MOTOR CYCLE SHADE AT YAYA CENTRA-NYARAMBA MKT NYCG/Q016/2015-2016 Lands, Housing and Urban Development Completed Kiabonyoru Feedback
RIAGICHANA, RIAKIMAI, RIASIREMBE SPRINGS Water, Sanitation, and Irrrigation Completed 909,330.80 Bosamaro Feedback
MOTOR CYCLE SHADE AT ONSEKA JUNCTION-NYAWARE RD MOKOMONI MKT NYCG/Q016/2015-2016 Lands, Housing and Urban Development Completed Kiabonyoru Feedback
RIOTWORI SPRING Water, Sanitation, and Irrrigation Completed 199,280.00 Nyansiongo Feedback
MOTOR CYCLE SHADE AT MAGOMBO MKT NYCG/Q017/2015-2016 Lands, Housing and Urban Development Completed Magombo Feedback
NYARONDE SPRING Water, Sanitation, and Irrrigation Completed 4,176,163.50 Mekenene Feedback
MOTOR CYCLE SHADE AT NYAIKURO STAGE NYCG/Q017/2015-2016 Lands, Housing and Urban Development Completed Magombo Feedback
MACHURIRIATI WATER SUPPLY Water, Sanitation, and Irrrigation Completed 7,901,859.90 Rigoma Feedback
MOTOR CYCLE SHADE AT SIRONGA STAGE NYCG/Q019/2015-2016 Lands, Housing and Urban Development Completed Bogichora Feedback
KEBIRIGO WATER SUPPLY SCHEME Water, Sanitation, and Irrrigation Completed 6,543,780.70 Nyamaiya Feedback
MOTOR CYCLE SHADE AT MOSOBETI MKT NYCG/Q020/2015-2016 Lands, Housing and Urban Development Completed Bosamaro Feedback
MOTOR CYCLE SHADE AT TOMBE MKT NYCG/Q021/2015-2016 Lands, Housing and Urban Development Completed Manga Feedback
MIRIRI BOREHOLE Water, Sanitation, and Irrrigation Completed 6,427,243.00 Gachuba Feedback
MOTOR CYCLE SHADE AT MANGA NYCG/Q021/2015-2016 Lands, Housing and Urban Development Completed Manga Feedback
MOTOR CYCLE SHADE AT RIGOMA MKT NYCG/Q024/2015-2016 Lands, Housing and Urban Development Completed 181,366.00 Rigoma Feedback
ISINTA BOREHOLE Water, Sanitation, and Irrrigation Completed 6,645,718.40 Itibo Feedback
MOTOR CYCLE SHADE AT IBENCHO NYCG/Q025/2015-2016 Lands, Housing and Urban Development Completed Magwagwa Feedback
IRINGAGRAVITY WATER SUPPLY Water, Sanitation, and Irrrigation Completed 6,673,525.60 Manga Feedback
MOTOR CYCLE SHADE AT MIRUKA STAGE NYCG/Q026/2015-2016 Lands, Housing and Urban Development Completed 198,603.00 Nyamaiya Feedback
GACHUBARIGOMA LINES Water, Sanitation, and Irrrigation Completed 6,053,000.00 Gachuba Feedback
MOTOR CYCLE SHADE AT KEBIRIGO MKT NYCG/Q027/2015-2016 (Ujamaa) Lands, Housing and Urban Development Completed 180,000.00 Bonyamatuta Feedback
RIAKIMANGA&AMAKARA SPRINGS Water, Sanitation, and Irrrigation Completed 6,464,225.40 Nyansiongo Feedback
MOTOR CYCLE SHADE AT OMOSARIA NYCG/Q028/2015-2016 Lands, Housing and Urban Development Completed 195,402.00 Bokeira Feedback
NYAGWACHA SPRING WATER SUPPLY Water, Sanitation, and Irrrigation Completed 8,629,326.30 Nyamaiya Feedback
OPENING OF IKONGE ROAD (LAOUR BASED METHOD) Lands, Housing and Urban Development Completed 2,500,000.00 Ekerenyo Feedback
KIANUNGU BOREHOLE WATER SUPPLY Water, Sanitation, and Irrrigation Completed 6,571,135.00 Bosamaro Feedback
COMPLETION OF NYABITE RETAIL MARKET CGN/T061/2015 -2016 Lands, Housing and Urban Development Completed Township Feedback
RIAMORURI WATER SUPPLY Water, Sanitation, and Irrrigation Completed 7,473,575.00 Feedback
CONSTRUCTION OF CAR PARKING LOTS IN NYAMIRA TOWN CGN/T062/2015-2016 Lands, Housing and Urban Development Completed 8,913,486.39 Township Feedback
MANGA GIRLS WATER SUPPLY Water, Sanitation, and Irrrigation Completed 9,065,181.70 Esise Feedback
REFURBISHMENT OF HOSPITAL STAFF QUARTERS IN NYAMIRA HOSPITAL NYCG/Q081/2015-2016 Lands, Housing and Urban Development Completed 1,433,866.72 Township Feedback
EKERENYO SPRING Water, Sanitation, and Irrrigation Completed 8,856,869.15 Ekerenyo Feedback
CONSTRUCTION OF 6 NUMBER PIT LATRINE AT ITIBO NYCG/Q110/2015-2016 Lands, Housing and Urban Development Completed Itibo Feedback
GATUTA-NYAKOME SPRING Water, Sanitation, and Irrrigation Completed 1,690,706.00 Manga Feedback
CONSTRUCTION OF 6 NUMBER PIT LATRINE AT METAMAYWA MKT NYCG/Q113/2015-2016 Lands, Housing and Urban Development Completed Rigoma Feedback
RIARIECHI, RIASURE, RIOMENDA, OGANGO SPRINGS Water, Sanitation, and Irrrigation Completed 5,443,215.80 Manga Feedback
CONSTRUCTION OF MIRUKA BUS PARK NYCG/Q216/2015-2016. Lands, Housing and Urban Development Completed 2,310,956.00 Nyamaiya Feedback
NYAMBUNWA , RIATANDI, RIOMARE WATER SUPPLY Water, Sanitation, and Irrrigation Completed 1,009,934.60 Gachuba Feedback
REFURBISHMENT OF NYANSIONGO TOWN ADMINISTRATION OFFICES NYCG/Q229/2015-2016 Lands, Housing and Urban Development Completed 1,321,770.00 Nyansiongo Feedback
KORONYA,NYABIGENA,MAGWAGWA, RIAKERANDI Water, Sanitation, and Irrrigation Completed 5,417,893.85 Magwagwa Feedback
PROPOSED CONSTRUCTION OF CAR PARKING LOTS BETWEEN NYAMIRA LEVEL 5 HOSPITAL AND HUDUMA CENTRE IN NYAMIRA TOWN (LOT-2) CGN/T08/2016-2017 Lands, Housing and Urban Development Completed Township Feedback
BOGWENDO BOREHOLE Water, Sanitation, and Irrrigation Completed 7,049,190.00 Magombo Feedback
PROPOSED CONSTRUCTION OF CAR PARKING LOTS BETWEEN PUBLIC WORKS AND CO-OP BANK IN NYAMIRA TOWN (LOT-1) CGN/T09/2016-2017 Lands, Housing and Urban Development Completed 15,376,187.00 Township Feedback
MATUNWA BOREHOLE Water, Sanitation, and Irrrigation Completed 7,003,260.00 Itibo Feedback
EXPRESSION OF INTEREST FOR PURCHASE OF LAND WITHIN KEROKA TOWN ( 2 ACRES) CGN/EOI/1/2016-2017 Lands, Housing and Urban Development Completed 3,800,000.00 Rigoma Feedback
MARINDI BOREHOLE Water, Sanitation, and Irrrigation Completed 6,960,500.00 Bogichora Feedback
EXPRESSION OF INTEREST FOR PURCHASE OF LAND WITHIN KIABONYORU WARD ( 2 ACRES) CGN/EOI/1/2016-2017 Lands, Housing and Urban Development Completed 3,600,000.00 Kiabonyoru Feedback
NYANGENA BOREHOLE Water, Sanitation, and Irrrigation Completed 7,432,932.00 Bosamaro Feedback
OMORARE BOREHOLE CGN/T038/2014-2015 Environment, Water, Energy, Mining and Natural Resources Completed 3,744,375.00 Ekerenyo Feedback
NYANGWARE BOREHOLE Water, Sanitation, and Irrrigation Completed 7,535,012.00 Kiabonyoru Feedback
NYARIACHO BOREHOLE CGN/T039/2014-2015 Environment, Water, Energy, Mining and Natural Resources Completed 2,524,276.00 Gachuba Feedback
OKANO BOREHOLE Water, Sanitation, and Irrrigation Completed 7,536,500.00 Bokeira Feedback
NYANCHONORIA BOREHOLE CGN/T040/2014-2015 Environment, Water, Energy, Mining and Natural Resources Completed 2,583,320.00 Rigoma Feedback
OMOKIRONDO BOREHOLE Water, Sanitation, and Irrrigation Completed 4,334,920.00 Itibo Feedback
NYANDOCHE IBERE B/HOLE CGN/T041/2014-2015 Environment, Water, Energy, Mining and Natural Resources Completed 2,457,460.00 Nyansiongo Feedback
EXTENSION OF WATER PIPELINE & STORAGE FACILITY AT KEBABE SECONDARY SCHOOL Water, Sanitation, and Irrrigation Completed 1,527,900.00 Ekerenyo Feedback
CONSTRUCTION OF BOMWAGAMO NYAMUSI WATER SUPPLY CGN/T063/2015 - 2016 Environment, Water, Energy, Mining and Natural Resources Completed 10,757,296.79 Bomwagamo Feedback
INTALLATION OF RAIN WATER HARVESTING FACILITY AT RIOMEGO SEC. SCH Water, Sanitation, and Irrrigation Completed 552,720.00 Magwagwa Feedback
DRILLING OF ENCHORO BOREHOLE CGN/T064/2015 - 2016 Environment, Water, Energy, Mining and Natural Resources Completed 3,150,188.80 Bosamaro Feedback
COMPLETION OF KINENI BOREHOLE DRILLING CGN/T009/2014-2015 Water, Sanitation, and Irrrigation Completed 4,475,280.00 Esise Feedback
CONSTRUCTION OF KEMASARE WATER PROJECT CGN/T065/2015 - 2016 Environment, Water, Energy, Mining and Natural Resources Completed 18,598,687.00 Nyamaiya Feedback
KIBWOGE POLYTECHNIC Education and Vocation Training Completed 2,251,432.40 Kemera Feedback
CONSTRUCTION OF KITARU EMBOYE WATER PROJECT CGN/T066/2015 - 2016 Environment, Water, Energy, Mining and Natural Resources Completed 3,906,100.00 Mekenene Feedback
MATONGO POLYTECHNIC Education and Vocation Training Completed 2,366,286.09 Magwagwa Feedback
CONSTRUCTION OF NYABISIMBA WATER SUPPLY CGN/T067/2015 - 2016 Environment, Water, Energy, Mining and Natural Resources Completed 2,779,462.50 Bonyamatuta Feedback
MISAMBI POLYTECHNIC Education and Vocation Training Completed 2,410,750.30 Magwagwa Feedback
CONSTRUCTION OF NYANSIONGO GEKONGE WATER SUPPLY CGN/T068/2015 - 2016 Environment, Water, Energy, Mining and Natural Resources Completed 7,073,475.00 Bokeira Feedback
KEGWANDA POLYTECHNIC Education and Vocation Training Completed 2,402,844.90 Rigoma Feedback
CONSTRUCTION OF RAITIGO WATER SUPPLY CGN/T069/2015 - 2016 Environment, Water, Energy, Mining and Natural Resources Completed 8,441,316.00 Esise Feedback
KENYERERE POLYTECHNIC Education and Vocation Training Completed 2,050,659.60 Magombo Feedback
CONSTRUCTION OF RITIBO WATER SUPPLY CGN/T070/2015 - 2016 Environment, Water, Energy, Mining and Natural Resources Completed 2,649,966.95 Gesima Feedback
PROPOSED CONST. OF KEMASARE II WATER SUPPLY CGN/T020/2016-2017 Environment, Water, Energy, Mining and Natural Resources Completed 2,500,000.00 Nyamaiya Feedback
PROPOSED CONST. OF NYAMBARIA I WATER PROJECT CGN/T021/2016-2017 Environment, Water, Energy, Mining and Natural Resources Completed Magombo Feedback
PROPOSED DRILLING OF BOSIANGO BOREHOLECGN/T022/2016-2017 Environment, Water, Energy, Mining and Natural Resources Completed Bogichora Feedback
ST. STEPHEN EKERUBO POLYTECHNIC Education and Vocation Training Completed 2,188,250.40 Itibo Feedback
PROPOSED CONST. OF ERONGE PRIMARY WATER SUPPLY CGN/T023/2016-2017 Environment, Water, Energy, Mining and Natural Resources Completed Esise Feedback
ST. ELIZABETH EMBARO POLYTECHNIC Education and Vocation Training Completed 2,296,481.00 Rigoma Feedback
PROPOSED DRILLING OF GESURE BOREHOLE CGN/T024/2016-2017 Environment, Water, Energy, Mining and Natural Resources Completed 3,254,960.00 Manga Feedback
SAIGANGIYA POLYTECHNIC Education and Vocation Training Completed 2,260,538.00 Nyansiongo Feedback
PROPOSED DRILLING OF RIOMEGO BOREHOLE CGN/T025/2016-2017 Environment, Water, Energy, Mining and Natural Resources Completed Magwagwa Feedback
MONGORI POLYTECHNIC Education and Vocation Training Completed 2,343,520.20 Mekenene Feedback
PROPOSED CONST. OF NYANSIONGO GEKONGE II WATER SUPPLY CGN/T026/2016-2017 Environment, Water, Energy, Mining and Natural Resources Completed 1,500,000.00 Magwagwa Feedback
PROPOSED CONST. OF RAITIGO II WATER SUPPLY CGN/T027/2016-2017 Environment, Water, Energy, Mining and Natural Resources Completed 3,000,000.00 Esise Feedback
RITIBO POLYTECHNIC Education and Vocation Training Completed 2,238,057.60 Gesima Feedback
PROPOSED CONST. OF KIABONYORU WATER SUPPLY CGN/T028/2016-2017 Environment, Water, Energy, Mining and Natural Resources Completed Kiabonyoru Feedback
NYAIRANG’A POLYTECHNIC Education and Vocation Training Completed 2,226,585.20 Ekerenyo Feedback
PROPOSED CONST. OF NYANCHONORIA WATER SUPPLY CGN/T029/2016-2017 Environment, Water, Energy, Mining and Natural Resources Completed Rigoma Feedback
NYAIKURO POLYTECHNIC Education and Vocation Training Completed 2,085,491.20 Manga Feedback
PROPOSED CONST. OF NYANDOCHE IBERE WATER SUPPLY CGN/T030/2016-2017 Environment, Water, Energy, Mining and Natural Resources Completed Nyansiongo Feedback
PROPOSED CONST. OF NYARIACH WATER SUPPLY CGN/T031/2016-2017 Environment, Water, Energy, Mining and Natural Resources Completed Gachuba Feedback
PROPOSED CONST. OF OMORARE WATER SUPPLY CGN/T032/2016-2017 Environment, Water, Energy, Mining and Natural Resources Completed 2,500,000.00 Ekerenyo Feedback
SUPPLY, DELIVERY, INSTALLATION, COMMISSIONING AND MAINTENANCE OF 42 POLES SOLAR POWERED STREET LIGHTING PROJECT IN NYAMIRA COUNTY CGN/T057/2016-2017 Environment, Water, Energy, Mining and Natural Resources Completed 8,783,932.00 Township Feedback
NASARI POLYTECHNIC Education and Vocation Training Completed 1,596,450.00 Itibo Feedback
NYABITE MARKET Trade, Tourism and Co-operative Development Completed 11,900,416.40 Township Feedback
Proposed Construction and Completion of Inpatient wards at Manga Sub County Hospital Improved infrustructure Health Services Stalled 34,237,845.00 Manga Feedback
Costruction and Complition of twin staff house with two No.door pit latrine at Emenyenche health facility Improved infrustructure Health Services Stalled 3,687,645.00 Gesima Feedback
Costruction and Complition of twin staff house with two No.door pit latrine at Kiangoso health facility Improved infrustructure Health Services Stalled 3,840,876.00 Kemera Feedback
Construction and completion of twin staff house with two number door Pit latrine at Nyandoche Ibere Health Centre Improved infrustructure Health Services Stalled 3,840,876.00 Nyansiongo Feedback
Construction and completion of twin staff house with two number door pit latrine at Motagara Dispensary Centre Improved infrustructure Health Services Stalled 3,990,155.00 Bosamaro Feedback
Proposed Construction of and Completion of OPD Block at Kenyamware Health Facility. Improved infrustructure Health Services Stalled 3,982,658.40 Magombo Feedback
Proposed Construction and Completion of Twin Staff House with two number door pit Latrine at Nyachonoria Health Facility Improved infrustructure Health Services Stalled 3,486,142.80 Rigoma Feedback
Proposed Construction and Completion of Twin Staff House with two number door pit Latrine at Kahawa Health Facility Improved infrustructure Health Services Stalled 3,600,986.00 Esise Feedback
Proposed Construction and Completion of Twin Staff House with two number door pit Latrine at Nyakeore Health Facility Improved infrustructure Health Services Stalled 3,441,671.40 Bonyamatuta Feedback
Construction and Completion of Nyamira County Referral Hospital Covid 19 Isolation Complex Improved infrustructure Health Services Stalled 95,860,834.37 Township Feedback
REHABILITATION TO NYAMIRA SIDEWALK Roads, transport, public works and Disaster Management Stalled 1,260,000.00 Township Feedback
KIJAURI ROCHE -OMOKUA-MASIGE UR-51 Roads, transport, public works and Disaster Management Stalled 1,007,217.03 Nyansiongo Feedback
NYANGOSO-NYAMIACHO-KIOGE MARKET-BOMBO CENTRAL-KEGOGI-NYAMONURI UR-16 Roads, transport, public works and Disaster Management Stalled Bomwagamo Feedback
MIRUKA-NYANDOCHE IBERE UR-18 Roads, transport, public works and Disaster Management Stalled 2,797,699.20 Nyamaiya Feedback
KEBIRIGO-KABATIA-RIAMASARE-BOKIMO-KENYENYA UR 11 Roads, transport, public works and Disaster Management Stalled 2,869,344.00 Bonyamatuta Feedback
GESONSO-NYANGOSO AND GESORE JUNC-BUNDO UR-47/48 Roads, transport, public works and Disaster Management Stalled 1,191,600.00 Township Feedback
KINENI BOREHOLE Water, Sanitation, and Irrrigation Stalled 3,200,000.00 Esise Feedback