| REFURBISHMENT OF NYAMIRALEVEL 4 HOSPITAL MAIN GATE CGN/149/2013-14 |
Improved infrustructure |
Health Services |
Completed
|
7,680,831.54 |
Township |
Feedback |
| OUTPATIENT BLOCK AT NYABOGOYE HEALTH FACILITY NYCG/Q114/2014-2015 |
Improved infrustructure |
Health Services |
Completed
|
3,985,551.20 |
Rigoma |
Feedback |
| OUTPATIENT BLOCK AT NYANGORI HEALTH FACILITY NYCG/Q115/2014-2015 |
Improved infrustructure |
Health Services |
Completed
|
3,956,006.00 |
Rigoma |
Feedback |
| MATERNITY BLOCK AT KIANGOSO HEALTH FACILITY NYCG/Q117/2014-2015 |
Improved infrustructure |
Health Services |
Completed
|
3,913,504.00 |
Kemera |
Feedback |
| MATERNITY BLOCK AT KIANUNGU HEALTH FACILITY NYCG/Q118/2014-2015 |
Improved infrustructure |
Health Services |
Completed
|
3,994,261.60 |
Bosamaro |
Feedback |
| MATERNITY BLOCK AT NYAIGESA HEALTH FACILITY NYCG/Q140/2014-2015 |
Improved infrustructure |
Health Services |
Completed
|
3,800,803.80 |
Nyamaiya |
Feedback |
| MATERNITY BLOCK AT MOKOMONI HEALTH FACILITY NYCG/Q142/2014-2015 |
Improved infrustructure |
Health Services |
Completed
|
3,806,603.80 |
Kiabonyoru |
Feedback |
| CONSTRUCTION OF MATERNITY BLOCK AT BOMBAGI HEALTH FACILITY NYCG/Q080/2015 - 2016 |
Improved infrustructure |
Health Services |
Completed
|
3,800,593.00 |
Township |
Feedback |
| CONSTRUCTION OF OUT-PATIENT BLOCK AT RIAMONI HEALTH FACILITY NYCG/Q130/2015 - 2016 |
Improved infrustructure |
Health Services |
Completed
|
3,850,260.00 |
Rigoma |
Feedback |
| CONSTRUCTION OF OUT-PATIENT BLOCK AT TINDERETI HEALTH FACILITY NYCG/Q153/2015 - 2016 |
Improved infrustructure |
Health Services |
Completed
|
3,960,200.00 |
Nyansiongo |
Feedback |
| CONSTRUCTION AND COMPLETION OF OPERATING THEATRE, X-RAY AND MATERNITY WARDS AT NYANSIONGO SUB-COUNTY HOSPITAL CGN/T074/2015-16 |
Improved infrustructure |
Health Services |
Completed
|
13,586,494.00 |
Nyansiongo |
Feedback |
| Construction and Completion of 80 Bed Amenity Block with |Doctor’s Plaza at Nyamira County Referral Hospital CGN/T075/2015-16 |
Improved infrustructure |
Health Services |
Completed
|
142,319,154.20 |
Township |
Feedback |
| CONSTRUCTION AND COMPLETION OF OPERATING THEATRE AT NYAMIRA COUNTY REFERRAL HOSPITAL CGN/T076/2015-16 |
Improved infrustructure |
Health Services |
Completed
|
18,154,731.00 |
Township |
Feedback |
| PROPOSED COMPLETION OF ESANI SUB COUNTY HOSPITAL STALLED STORY BUILDING NYCG/Q285/2015-16 |
Improved infrustructure |
Health Services |
Completed
|
3,975,262.00 |
Rigoma |
Feedback |
| CONSTRUCTION OF RIOTONYI OPD BLOCK NYCG/Q262/2015-2016 |
Improved infrustructure |
Health Services |
Completed
|
3,985,286.00 |
Gachuba |
Feedback |
| PROPOSED COMPLETION KAMBINI OUTPAPIENT BLOCK NYCG/Q283/2015-2016 |
Improved infrustructure |
Health Services |
Completed
|
3,943,257.00 |
Gesima |
Feedback |
| CONSTRUCTION OF NYAOBE HEALTH FACILITY NYCG/Q331/2015-2016 |
Improved infrustructure |
Health Services |
Completed
|
3,890,122.64 |
Bokeira |
Feedback |
| PROPOSED COMPLETION OF SERE OUTPAPIENT BLOCK NYCG/Q334/2015-2016 |
Improved infrustructure |
Health Services |
Completed
|
3,150,000.00 |
Bomwagamo |
Feedback |
| PROPOSED COMPLETION OF NYAKEGOGI DISPENSARY NYCG/Q335/2015-2016 |
Improved infrustructure |
Health Services |
Completed
|
3,890,302.20 |
Kemera |
Feedback |
| PROPOSED COMPLETION OF OUT PATIENT BLOCK GATUTA HEALTH CENTRE NYCG/Q440/2015-2016 |
Improved infrustructure |
Health Services |
Completed
|
3,890,900.00 |
Magombo |
Feedback |
| Proposed Construction and Completion of Inpatient wards with operaing Theater block at Magwagwa Health Facility |
Improved infrustructure |
Health Services |
Completed
|
64,551,975.80 |
Magwagwa |
Feedback |
| Proposed Construction and Completion of Inpatient wards at Gesima Sub County Hospital |
Improved infrustructure |
Health Services |
Completed
|
34,999,235.00 |
Gesima |
Feedback |
| Proposed Construction and Completion of Inpatient wards at Nyamusi Sub County Hospital |
Improved infrustructure |
Health Services |
Completed
|
34,865,540.00 |
Bokeira |
Feedback |
| Supply and Delivery of a Stand by Generator Set at Nyamira County Referral Hospital |
Improved infrustructure |
Health Services |
Completed
|
9,300,000.00 |
Township |
Feedback |
| Proposed Construction and Completion of Inpatient wards block at Nyabweri Health Facility |
Improved infrustructure |
Health Services |
Completed
|
13,239,878.08 |
Bomwagamo |
Feedback |
| Costruction and Complition of twin staff house with two No.door pit latrine at Kambini health facility |
Improved infrustructure |
Health Services |
Completed
|
3,518,800.00 |
Gesima |
Feedback |
| Costruction and Complition of twin staff house with two No.door pit latrine at Kenyamware health facility |
Improved infrustructure |
Health Services |
Completed
|
3.00 |
Magombo |
Feedback |
| Costruction and Complition of twin staff house with two No.door pit latrine at Kiangombe health facility |
Improved infrustructure |
Health Services |
Completed
|
3,574,377.60 |
Itibo |
Feedback |
| Construction and Completion of maternity block at Motontera dispensary |
Improved infrustructure |
Health Services |
Completed
|
3,620,684.80 |
Bomwagamo |
Feedback |
| Construction and completion of Maternity block at Orwaki Health Centre |
Improved infrustructure |
Health Services |
Completed
|
3,505,897.00 |
Bokeira |
Feedback |
| Construction and completion of OPD Block with Two number Pit latrine at Ribaita Health Centre |
Improved infrustructure |
Health Services |
Completed
|
3,802,665.00 |
Nyansiongo |
Feedback |
| Construction and completion of twin staff house with two number door pit latrine at Nyagacho |
Improved infrustructure |
Health Services |
Completed
|
3,986,142.80 |
Mekenene |
Feedback |
| Construction and completion of twin staff house with two number door pit latrine at Nyamaiya Health Centre |
Improved infrustructure |
Health Services |
Completed
|
3,334,090.00 |
Nyamaiya |
Feedback |
| Construction and completion of OPD with two number door pit latrine at Ikobe Health Centre |
Improved infrustructure |
Health Services |
Completed
|
3,630,486.80 |
Manga |
Feedback |
| Construction and completion of twin staff house with two number door pit latrine at Kianginda Health Centre |
Improved infrustructure |
Health Services |
Completed
|
3,619,200.00 |
Magombo |
Feedback |
| Construction and completion of OPD Block with two number door pit latrine at Nyamwanga Health Centre |
Improved infrustructure |
Health Services |
Completed
|
3,524,845.60 |
Magombo |
Feedback |
| Proposed Construction and completion to OPD block with two no.door pit latrine at Esianyi Health F acility |
Improved infrustructure |
Health Services |
Completed
|
3,999,997.80 |
Bokeira |
Feedback |
| Proposed Completion to Esani Sub County Hospital stalled story Building Phase4 |
Improved infrustructure |
Health Services |
Completed
|
3,982,059.60 |
Gesima |
Feedback |
| Proposed Construction and Completion of Inpatient Wards at Amatierio Health Facility |
Improved infrustructure |
Health Services |
Completed
|
14,716,807.20 |
Kiabonyoru |
Feedback |
| Proposed Construction and Completion of Inpatient Wards at Kiangoso Health Facility |
Improved infrustructure |
Health Services |
Completed
|
14,567,000.00 |
Kemera |
Feedback |
| Proposed Construction and Completion of Maternity Block at Mongoni Health Facility |
Improved infrustructure |
Health Services |
Completed
|
3,355,732.50 |
Rigoma |
Feedback |
| Proposed Construction and Completion of OPD Block with two number door pit Latrine at Bobembe Health Facility |
Improved infrustructure |
Health Services |
Completed
|
3,330,402.80 |
Bogichora |
Feedback |
| Proposed Construction and Completion of OPD Block with two number door pit Latrine at Nyaobe Health Facility |
Improved infrustructure |
Health Services |
Completed
|
3,575,416.20 |
Bokeira |
Feedback |
| Proposed Construction and Completion of OPD Block with two number door pit Latrine at Geseneno Health Facility |
Improved infrustructure |
Health Services |
Completed
|
3,305,162.80 |
Township |
Feedback |
| Proposed Construction and Completion of OPD Block with two No.door pit latrine at Bomorito Health Facility |
Improved infrustructure |
Health Services |
Completed
|
3,977,834.88 |
Nyamaiya |
Feedback |
| Proposed construction and completion of OPD Block with two No.door pit latrine at Nyanchoka Health Facility |
Improved infrustructure |
Health Services |
Completed
|
3,654,423.40 |
Kiabonyoru |
Feedback |
| Proposed Construction and Completion of out patient block with two No. door pit latrine at Bobaracho haelth facility |
Improved infrustructure |
Health Services |
Completed
|
3,999,946.80 |
Bogichora |
Feedback |
| Renovation of Nyangena Health Facility |
Improved infrustructure |
Health Services |
Completed
|
14,323,210.00 |
Manga |
Feedback |
| Renovation of Kenyenya Health Facility |
Improved infrustructure |
Health Services |
Completed
|
13,248,360.00 |
Bonyamatuta |
Feedback |
| Renovation of Magombo Health Facility |
Improved infrustructure |
Health Services |
Completed
|
11,904,540.00 |
Magombo |
Feedback |
| Renovation of Kerobo Health Facility |
Improved infrustructure |
Health Services |
Completed
|
7,925,120.00 |
Kiabonyoru |
Feedback |
| Renovation of Machururiati Health Facility |
Improved infrustructure |
Health Services |
Completed
|
13,550,905.00 |
Gesima |
Feedback |
| Renovation of Chepng'ombe Health Facility |
Improved infrustructure |
Health Services |
Completed
|
12,005,806.00 |
Esise |
Feedback |
| Rehabilitation of Drive Way and Parking at Nyamira County Referral Hospital |
Improved infrustructure |
Health Services |
Completed
|
18,126,920.00 |
Township |
Feedback |
| Construction of Toilet and Refurbishing of Nyabonge Dispensary |
Improved infrustructure |
Health Services |
Completed
|
4,999,999.00 |
Itibo |
Feedback |
| Completion of Staff House and Fencing at Isicha Health
Facility |
Improved infrustructure |
Health Services |
Completed
|
2,499,815.00 |
Kiabonyoru |
Feedback |
| Proposed construction and
completion of Manga Stadium Sports/Football Pitch and Running Truck |
Improved infrustructure |
Gender, Youth, Sports, Culture and Social Services |
Completed
|
20,301,660.54 |
Manga |
Feedback |
| Construction and completion of ECDE Classroom at Kenyoro Primary in Esise Ward |
Improved infrustructure |
Education and Vocation Training |
Completed
|
3,999,500.00 |
Esise |
Feedback |
| Construction and completion of ECDE Classroom at Ritibo Primary in Gesima Ward |
Improved infrustructure |
Education and Vocation Training |
Completed
|
3,498,159.80 |
Gesima |
Feedback |
| Construction and completion of ECDE Classroom at Omobiro Primary in Bokeira Ward |
Improved infrustructure |
Education and Vocation Training |
Completed
|
3,498,159.80 |
Bokeira |
Feedback |
| Construction and completion of ECDE Classroom at Simbauti Primary in Nyansiongo Ward |
Improved infrustructure |
Education and Vocation Training |
Completed
|
3,196,922.00 |
Nyansiongo |
Feedback |
| Construction and completion of ECDE at Kenyoro Primary in Itibo Ward |
Improved infrustructure |
Education and Vocation Training |
Completed
|
3,180,190.00 |
Itibo |
Feedback |
| Proposed Construction of water Tank & Distribution of water from Ribariri Water Project in Magwagwa Ward |
Improved Water Supply |
Water, Sanitation, and Irrrigation |
Completed
|
4,979,053.27 |
Magwagwa |
Feedback |
| Proposed Equipping and Distribution of Tonga Omonuri Borehole in Nyamaiya Ward |
Improved Water Supply |
Water, Sanitation, and Irrrigation |
Completed
|
3,644,966.42 |
Nyamaiya |
Feedback |
| Proposed Rehabilitation of Obwari Borehole in Ekerenyo Ward |
Improved Water Supply |
Water, Sanitation, and Irrrigation |
Completed
|
1,199,225.16 |
Ekerenyo |
Feedback |
| Proposed Rehabilitation of Nyangena Borehole in Bosamaro Ward |
Improved Water Supply |
Water, Sanitation, and Irrrigation |
Completed
|
1,496,268.75 |
Bosamaro |
Feedback |
| Proposed Rehabilitation of Gesure Borehole in Manga Ward |
Improved Water Supply |
Water, Sanitation, and Irrrigation |
Completed
|
1,499,995.00 |
Manga |
Feedback |
| Proposed Construction and Protection of Water Springs in Itibo Ward |
Improved Water Supply |
Water, Sanitation, and Irrrigation |
Completed
|
4,944,823.00 |
Itibo |
Feedback |
| Proposed Construction and Protection of Water Springs in Bokeira Ward |
Improved Water Supply |
Water, Sanitation, and Irrrigation |
Completed
|
3,955,858.40 |
Bokeira |
Feedback |
| Restoration of Gesebei dam |
Improved Water Supply |
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
4,496,928.67 |
|
Feedback |
| Construction of Kebirigo market Material recovery facility |
Waste Management |
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
1,248,998.39 |
Bonyamatuta |
Feedback |
| Construction of Keroka Material recovery facility |
Waste Management |
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
1,240,412.01 |
Rigoma |
Feedback |
| Construction of Ikonge market Material recovery facility |
Waste Management |
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
1,249,956.38 |
Ekerenyo |
Feedback |
| Construction of Nyansiongo business centre Material recovery facility |
Waste Management |
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
1,245,152.74 |
Nyansiongo |
Feedback |
| Construction of Miruka market Material recovery facility |
Waste Management |
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
1,249,860.56 |
Nyamaiya |
Feedback |
| Construction of Kemera market Material recovery facility |
Waste Management |
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
1,201,412.72 |
Kemera |
Feedback |
| Establishment of Nyamira North sub county indigenous tree nursery |
Afforestation |
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
2,990,147.17 |
Ekerenyo |
Feedback |
| Establishment of Nyamira South sub county indigenous tree nursery |
Afforestation |
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
2,998,397.00 |
Township |
Feedback |
| Establishment of Borabu sub county indigenous tree nursery |
Afforestation |
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
2,998,803.37 |
Nyansiongo |
Feedback |
| Establishment of Masaba North sub county indigenous tree nursery |
Afforestation |
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
2,998,397.00 |
Rigoma |
Feedback |
| Establishment of Manga sub county indigenous tree nursery |
Afforestation |
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
2,999,116.66 |
Manga |
Feedback |
| Construction of Nyamus market Material recovery facility |
Waste Management |
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
1,249,544.75 |
Bokeira |
Feedback |
| Ekegoro Borehole Water drilling and Casing project. |
Improved Water Supply |
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
2,404,970.00 |
Ekerenyo |
Feedback |
| Equipping and Distribution of Ekegoro Borehole Project |
Improved Water Supply |
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
3,999,680.00 |
Ekerenyo |
Feedback |
| Proposed Rehabilitation of Kenyerere Borehole |
Improved Water Supply |
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
1,142,942.78 |
Magwagwa |
Feedback |
| Proposed Rehabilitation of Marani Borehole |
Improved Water Supply |
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
1,405,181.40 |
|
Feedback |
| REHABILITATION AND REPAIR OF KEROKA BUS PARK |
|
Roads, transport, public works and Disaster Management |
Completed
|
15,835,160.00 |
Rigoma |
Feedback |
| REHABILITATION AND REPAIR OF ACCESS ROAD PARKING |
|
Roads, transport, public works and Disaster Management |
Completed
|
6,402,330.00 |
Township |
Feedback |
| COMPLETION OF NYAMIRA COUNTY COUNCIL PHASE - II |
|
Roads, transport, public works and Disaster Management |
Completed
|
18,443,043.00 |
Township |
Feedback |
| AMAKARA,NYARONDE ,KONA C, RIAMANOTI- UR 52 |
|
Roads, transport, public works and Disaster Management |
Completed
|
9,559,560.00 |
Nyansiongo |
Feedback |
| RIAMOSETI,RIOBWOCHA CONSTRUCTION & MAINTAINANCE (UR 23) |
|
Roads, transport, public works and Disaster Management |
Completed
|
3,245,416.50 |
Mekenene |
Feedback |
| MWONGORI MKRT,RIONSONGO ROAD UR-22 |
|
Roads, transport, public works and Disaster Management |
Completed
|
4,484,066.00 |
Mekenene |
Feedback |
| GUCHA-MARIBA JUNC-NYASWAGO JUNC-AVACADO-MOKOMONI UR-62 |
|
Roads, transport, public works and Disaster Management |
Completed
|
9,011,614.40 |
Kiabonyoru |
Feedback |
| ETANGI-NYANSAKIA SDA/TBC-MEBENO PRY. SCHOOL-RIOMBATI JUCTN UR-43 |
|
Roads, transport, public works and Disaster Management |
Completed
|
11,770,080.00 |
Esise |
Feedback |
| KEROKA-KIERIRA-RIKENYE UR-53 |
|
Roads, transport, public works and Disaster Management |
Completed
|
4,799,833.20 |
Rigoma |
Feedback |
| KEROKA POSTA-NYASORE ACADEMY-METAMANYWA UR-55 |
|
Roads, transport, public works and Disaster Management |
Completed
|
8,430,300.00 |
Rigoma |
Feedback |
| KIENDEGE-CHARARA-NYAGECHECHE UR-28 |
|
Roads, transport, public works and Disaster Management |
Completed
|
8,302,750.00 |
Kemera |
Feedback |
| TOMBE-NYAGUKU-MIRIRI-GEKANO TBC UR-1 |
|
Roads, transport, public works and Disaster Management |
Completed
|
6,381,562.00 |
Magombo |
Feedback |
| RIAKWORO-RISA ESANI-KEBUKO-GESABAKWA UR-6 |
|
Roads, transport, public works and Disaster Management |
Completed
|
2,388,878.20 |
Gesima |
Feedback |
| RITONGO-MATUTU-IRANYA UR-7 |
|
Roads, transport, public works and Disaster Management |
Completed
|
9,148,689.67 |
Gesima |
Feedback |
| GEKANO TBC-KEGOGI TBC-NYAKEMOGWA SDA-ERONGE SDA UR-37 |
|
Roads, transport, public works and Disaster Management |
Completed
|
6,585,640.02 |
Gachuba |
Feedback |
| MOTURUMESI-RIABAKA-GETENI-KEBOBA-KIOMOSO UR-38 |
|
Roads, transport, public works and Disaster Management |
Completed
|
1,985,410.00 |
Gachuba |
Feedback |
| RIABOTO-BIGOGO UR-31 |
|
Roads, transport, public works and Disaster Management |
Completed
|
4,454,405.18 |
Manga |
Feedback |
| NYAKARANGA JUNC-KEBOBORA-NYAKARANGA PRI.-OMOBIRO UR-4 |
|
Roads, transport, public works and Disaster Management |
Completed
|
9,004,643.44 |
Bokeira |
Feedback |
| ORWAKI BR-NYAMUSI-EGOTOTO UR-5 |
|
Roads, transport, public works and Disaster Management |
Completed
|
1,627,765.00 |
Bokeira |
Feedback |
| EKONA-NYAGEKOBOKOBO-MAGENA MARABU-ESERETI-BISEMBE UR-19 |
|
Roads, transport, public works and Disaster Management |
Completed
|
8,167,646.90 |
Magwagwa |
Feedback |
| MATORORA-ISINTA-CHINA-NYASIO-OMOKIRONDO UR-20 |
|
Roads, transport, public works and Disaster Management |
Completed
|
8,194,421.00 |
Itibo |
Feedback |
| EKERENYO-KIEMUMA-NYAMEKO UR-40 |
|
Roads, transport, public works and Disaster Management |
Completed
|
8,212,858.00 |
Ekerenyo |
Feedback |
| BWONYANGI-IKONGE DISPENSARY-BONYAMORITO UR-34 |
|
Roads, transport, public works and Disaster Management |
Completed
|
4,745,225.00 |
Nyamaiya |
Feedback |
| GESERO-GESIAGA SEC-BOKAYA-EKERUBO-SIRONGA UR-8 |
|
Roads, transport, public works and Disaster Management |
Completed
|
6,741,618.00 |
Bosamaro |
Feedback |
| NYABITE-NYANGOSO-NYAIRICHA-BOBONDO-KEBIRIGO UR-50 |
|
Roads, transport, public works and Disaster Management |
Completed
|
9,716,642.22 |
Township |
Feedback |
| NYABITE-RANGENYO-NYAKUNGURU-BONYUNYU UR-17 |
|
Roads, transport, public works and Disaster Management |
Completed
|
|
Nyamaiya |
Feedback |
| NYACHURURU - NYANGENA-TBC UR 10 |
|
Roads, transport, public works and Disaster Management |
Completed
|
4,591,767.80 |
Bosamaro |
Feedback |
| NYAMOKERI–EMONGA UR 35 |
|
Roads, transport, public works and Disaster Management |
Completed
|
2,846,830.00 |
Bogichora |
Feedback |
| KEBIRIGO-KABATIA-RIAMASARE-BOKIMO-KENYENYA-UR-11B |
|
Roads, transport, public works and Disaster Management |
Completed
|
5,292,932.00 |
Bonyamatuta |
Feedback |
| RIAGISEMBE FOOTBRIDGE CGN/T019/2014-2015 |
|
Roads, transport, public works and Disaster Management |
Completed
|
4,529,034.00 |
Gachuba |
Feedback |
| RIAGWARO FOOTBRIDGE CGN/T020/2014-2015 |
|
Roads, transport, public works and Disaster Management |
Completed
|
4,259,785.64 |
Bokeira |
Feedback |
| KAAGWA FOOTBRIDGE CGN/T021/2014- 2015 |
|
Roads, transport, public works and Disaster Management |
Completed
|
5,155,199.50 |
Nyansiongo |
Feedback |
| ITONGO SENGERA BOX CULVERT CGN/T022/2014-15 |
|
Roads, transport, public works and Disaster Management |
Completed
|
7,070,061.00 |
Rigoma |
Feedback |
| RIAPIMA BRIDGE AND APPROACH ROAD CGN/T023/2014-2015 |
|
Roads, transport, public works and Disaster Management |
Completed
|
16,457,549.01 |
Bogichora |
Feedback |
| RIASAGWE FOOTBRIDGE CGN/T024/2014-2015 |
|
Roads, transport, public works and Disaster Management |
Completed
|
4,212,014.75 |
Bogichora |
Feedback |
| NYAMACHE MAYA BOX CULVERT CGN/T025/2014-15 |
|
Roads, transport, public works and Disaster Management |
Completed
|
5,344,908.00 |
Township |
Feedback |
| MULTI-PURPOSE FIRE ENGINE TRUCK |
|
Roads, transport, public works and Disaster Management |
Completed
|
N/A |
Township |
Feedback |
| TERMINAL FACILITY AT KEBIRIGO CGN/T043/2014/2015 |
|
Roads, transport, public works and Disaster Management |
Completed
|
9,700,475.74 |
Bonyamatuta |
Feedback |
| TERMINAL FACILTY AND BACKSTREET AT NYANSIONGO CGN/T044/2014/2015 |
|
Roads, transport, public works and Disaster Management |
Completed
|
4,640,718.00 |
Nyansiongo |
Feedback |
| DEVELOPING AND UPGRADING OF CAR LOTS IN NYAMIRA COUNTY CGN/T045/2014-2015 |
|
Roads, transport, public works and Disaster Management |
Completed
|
9,765,939.20 |
Township |
Feedback |
| BACKSTREET AT KEROKA IN NYAMIRA COUNTY CGN/T047/2014-2015 |
|
Roads, transport, public works and Disaster Management |
Completed
|
7,375,024.58 |
Rigoma |
Feedback |
| EGESIERI-NYABITE-FLORIDA ROAD 1.5 Km. |
|
Roads, transport, public works and Disaster Management |
Completed
|
2,374,785.00 |
Township |
Feedback |
| NYAMWETUREKO-BONDENI ROAD-BONYAMATUTA ROAD |
|
Roads, transport, public works and Disaster Management |
Completed
|
3,015,285.00 |
Bonyamatuta |
Feedback |
| NYABARA IBERE-BOKIMO ROAD-BONYAMATUTA ROAD 2.4Km |
|
Roads, transport, public works and Disaster Management |
Completed
|
1,643,400.00 |
Bonyamatuta |
Feedback |
| BOX CULVERT AT RIANGWENYI |
|
Roads, transport, public works and Disaster Management |
Completed
|
1,533,220.00 |
Gesima |
Feedback |
| REPAIR & MAINTANANCE OF MOBAMBA CATHOLIC-BOMBWOBO-NYAKEMINCHA ROAD NYCG/KRB/Q310/2015-2016 |
|
Roads, transport, public works and Disaster Management |
Completed
|
1,997,995.00 |
Bonyamatuta |
Feedback |
| REPAIR & MAINTANANCE OF OTANYORE-ETONO-BONYUNYUNYCG/KRB/Q311/2015-2016 |
|
Roads, transport, public works and Disaster Management |
Completed
|
1,646,051.60 |
Bogichora |
Feedback |
| REPAIR & MAINTANANCE OF MIRUKA-ATEMOROADNYCG/KRB/Q313/2015-2016 |
|
Roads, transport, public works and Disaster Management |
Completed
|
2,067,111.90 |
Nyamaiya |
Feedback |
| REPAIR AND MAINTANANCE OF CO-OP BANK-SEN. KEBASO SEC SCH ROADNYCG/KRB/Q314/2015-2016 |
|
Roads, transport, public works and Disaster Management |
Completed
|
1,425,848.00 |
Township |
Feedback |
| REPAIR AND MAINTANANCE OF IKONGE-NYAORA-NYAMEKOBO ROADNYCG/KRB/Q315/2015-2016 |
|
Roads, transport, public works and Disaster Management |
Completed
|
2,088,128.00 |
Ekerenyo |
Feedback |
| REPAIR & MAINTANANCE OF EKERENYO-KEBABE-KANYANCHA-METHODIST CHURCH-OMWAMBA-RIAMEKI ROAD NYCG/KRB/Q316/2015-2016 |
|
Roads, transport, public works and Disaster Management |
Completed
|
2,081,820.10 |
Itibo |
Feedback |
| REPAIR & MAINTANANCE OF ERONGE-KIOGE ROAD NYCG/KRB/Q317/2015-2016 |
|
Roads, transport, public works and Disaster Management |
Completed
|
1,615,137.60 |
Bomwagamo |
Feedback |
| REPAIR & MAINTANANCE OF GESURA-IYWERO BRIDGEROADNYCG/KRB/Q319/2015-2016 |
|
Roads, transport, public works and Disaster Management |
Completed
|
2,859,472.50 |
Bokeira |
Feedback |
| REPAIR & MAINTANANCE OF RIAMBAKA- RIASAGWEROADNYCG/KRB/Q320/2015-2016 |
|
Roads, transport, public works and Disaster Management |
Completed
|
1,737,426.25 |
Esise |
Feedback |
| REPAIR & MAINTANANCE OF NYABIOTO-KIABONYORU-NDURUMO-ONYASWAMU ROAD NYCG/KRB/Q322/2015-2016 |
|
Roads, transport, public works and Disaster Management |
Completed
|
2,879,999.88 |
Kiabonyoru |
Feedback |
| REPAIR & MAINTANANCE OF RIANYASANI-GESABAKWA-RIARATI ROAD NYCG/KRB/Q323/2015-2016 |
|
Roads, transport, public works and Disaster Management |
Completed
|
2,125,337.50 |
Esise |
Feedback |
| REPAIR AND MAINTANANCE OF MOCHENWA SOCIETY-MOCHENWA DISP.-RIAMARANGA-MOCHENWA PRI SCH ROAD NYCG/KRB/Q324/2015-2016 |
|
Roads, transport, public works and Disaster Management |
Completed
|
2,137,227.50 |
Gesima |
Feedback |
| REPAIR AND MAINTANANCE OF GIRANGO CF JUNCTION-MASHAURI-RIANYASIMI- KEBIRICHI ROOCHE-RIAMOENGA-KEBOBA TBC-RIAMOSIGISI ROAD NYCG/KRB/Q326/2015-2016 |
|
Roads, transport, public works and Disaster Management |
Completed
|
2,687,306.00 |
Gachuba |
Feedback |
| REPAIR AND MAINTANANCE OF,RIASTEPHENE-BOGWENDO SEC SCH-RIOKENDO ROAD |
|
Roads, transport, public works and Disaster Management |
Completed
|
2,520,680.00 |
Magombo |
Feedback |
| REPAIR AND MAINTANANCE OF NYAIKURO JUNCTION- GESURE ROAD NYCG/KRB/Q328/2015-2016 |
|
Roads, transport, public works and Disaster Management |
Completed
|
2,094,304.60 |
Manga |
Feedback |
| REPAIR AND MAINTANANCE OF OMOGONCHORO-KIOMAKONDO ROAD NYCG/KRB/Q329/2015-2016 |
|
Roads, transport, public works and Disaster Management |
Completed
|
1,789,917.00 |
Kemera |
Feedback |
| PROVISION & SUPPLY OF MURRAM 15,000 METERS CUBIC NYCG/Q089/2016-2017 |
|
Roads, transport, public works and Disaster Management |
Completed
|
3,300,000.00 |
Bonyamatuta |
Feedback |
| PROVISION & SUPPLY OF MURRAM 20,000 METERS CUBIC NYCG/Q090/2016-2017 |
|
Roads, transport, public works and Disaster Management |
Completed
|
3,900,000.00 |
Bogichora |
Feedback |
| PROVISION & SUPPLY OF MURRAM 16,500 METERS CUBIC NYCG/Q093/2016-2017 |
|
Roads, transport, public works and Disaster Management |
Completed
|
3,217,500.00 |
Township |
Feedback |
| PROVISION & SUPPLY OF MURRAM 15,000 METERS CUBIC NYCG/Q094/2016-2017 |
|
Roads, transport, public works and Disaster Management |
Completed
|
3,000,000.00 |
Esise |
Feedback |
| PROVISION & SUPPLY OF MURRAM 13,000 METERS CUBIC NYCG/Q095/2016-2017 |
|
Roads, transport, public works and Disaster Management |
Completed
|
2,795,000.00 |
Nyamaiya |
Feedback |
| PROVISION & SUPPLY OF MURRAM 17,000 METERS CUBIC NYCG/Q097/2016-2017 |
|
Roads, transport, public works and Disaster Management |
Completed
|
3,434,000.00 |
Bosamaro |
Feedback |
| PROVISION & SUPPLY OF MURRAM 18,000 METERS CUBIC NYCG/Q098/2016-2017 |
|
Roads, transport, public works and Disaster Management |
Completed
|
3,240,000.00 |
Kemera |
Feedback |
| PROVISION & SUPPLY OF MURRAM 11,000 METERS CUBIC NYCG/Q100/2016-2017 |
|
Roads, transport, public works and Disaster Management |
Completed
|
2,200,000.00 |
Nyansiongo |
Feedback |
| TENTE BOREHOLE |
|
Water, Sanitation, and Irrrigation |
Completed
|
5,897,904.00 |
Township |
Feedback |
| RIAGICHANA, RIAKIMAI, RIASIREMBE SPRINGS |
|
Water, Sanitation, and Irrrigation |
Completed
|
909,330.80 |
Bosamaro |
Feedback |
| RIOTWORI SPRING |
|
Water, Sanitation, and Irrrigation |
Completed
|
199,280.00 |
Nyansiongo |
Feedback |
| NYARONDE SPRING |
|
Water, Sanitation, and Irrrigation |
Completed
|
4,176,163.50 |
Mekenene |
Feedback |
| MACHURIRIATI WATER SUPPLY |
|
Water, Sanitation, and Irrrigation |
Completed
|
7,901,859.90 |
Rigoma |
Feedback |
| KEBIRIGO WATER SUPPLY SCHEME |
|
Water, Sanitation, and Irrrigation |
Completed
|
6,543,780.70 |
Nyamaiya |
Feedback |
| MIRIRI BOREHOLE |
|
Water, Sanitation, and Irrrigation |
Completed
|
6,427,243.00 |
Gachuba |
Feedback |
| ISINTA BOREHOLE |
|
Water, Sanitation, and Irrrigation |
Completed
|
6,645,718.40 |
Itibo |
Feedback |
| IRINGAGRAVITY WATER SUPPLY |
|
Water, Sanitation, and Irrrigation |
Completed
|
6,673,525.60 |
Manga |
Feedback |
| GACHUBARIGOMA LINES |
|
Water, Sanitation, and Irrrigation |
Completed
|
6,053,000.00 |
Gachuba |
Feedback |
| RIAKIMANGA&AMAKARA SPRINGS |
|
Water, Sanitation, and Irrrigation |
Completed
|
6,464,225.40 |
Nyansiongo |
Feedback |
| NYAGWACHA SPRING WATER SUPPLY |
|
Water, Sanitation, and Irrrigation |
Completed
|
8,629,326.30 |
Nyamaiya |
Feedback |
| KIANUNGU BOREHOLE WATER SUPPLY |
|
Water, Sanitation, and Irrrigation |
Completed
|
6,571,135.00 |
Bosamaro |
Feedback |
| RIAMORURI WATER SUPPLY |
|
Water, Sanitation, and Irrrigation |
Completed
|
7,473,575.00 |
|
Feedback |
| MANGA GIRLS WATER SUPPLY |
|
Water, Sanitation, and Irrrigation |
Completed
|
9,065,181.70 |
Esise |
Feedback |
| EKERENYO SPRING |
|
Water, Sanitation, and Irrrigation |
Completed
|
8,856,869.15 |
Ekerenyo |
Feedback |
| GATUTA-NYAKOME SPRING |
|
Water, Sanitation, and Irrrigation |
Completed
|
1,690,706.00 |
Manga |
Feedback |
| RIARIECHI, RIASURE, RIOMENDA, OGANGO SPRINGS |
|
Water, Sanitation, and Irrrigation |
Completed
|
5,443,215.80 |
Manga |
Feedback |
| NYAMBUNWA , RIATANDI, RIOMARE WATER SUPPLY |
|
Water, Sanitation, and Irrrigation |
Completed
|
1,009,934.60 |
Gachuba |
Feedback |
| KORONYA,NYABIGENA,MAGWAGWA, RIAKERANDI |
|
Water, Sanitation, and Irrrigation |
Completed
|
5,417,893.85 |
Magwagwa |
Feedback |
| BOGWENDO BOREHOLE |
|
Water, Sanitation, and Irrrigation |
Completed
|
7,049,190.00 |
Magombo |
Feedback |
| MATUNWA BOREHOLE |
|
Water, Sanitation, and Irrrigation |
Completed
|
7,003,260.00 |
Itibo |
Feedback |
| MARINDI BOREHOLE |
|
Water, Sanitation, and Irrrigation |
Completed
|
6,960,500.00 |
Bogichora |
Feedback |
| NYANGENA BOREHOLE |
|
Water, Sanitation, and Irrrigation |
Completed
|
7,432,932.00 |
Bosamaro |
Feedback |
| NYANGWARE BOREHOLE |
|
Water, Sanitation, and Irrrigation |
Completed
|
7,535,012.00 |
Kiabonyoru |
Feedback |
| OKANO BOREHOLE |
|
Water, Sanitation, and Irrrigation |
Completed
|
7,536,500.00 |
Bokeira |
Feedback |
| OMOKIRONDO BOREHOLE |
|
Water, Sanitation, and Irrrigation |
Completed
|
4,334,920.00 |
Itibo |
Feedback |
| EXTENSION OF WATER PIPELINE & STORAGE FACILITY AT KEBABE SECONDARY SCHOOL |
|
Water, Sanitation, and Irrrigation |
Completed
|
1,527,900.00 |
Ekerenyo |
Feedback |
| INTALLATION OF RAIN WATER HARVESTING FACILITY AT RIOMEGO SEC. SCH |
|
Water, Sanitation, and Irrrigation |
Completed
|
552,720.00 |
Magwagwa |
Feedback |
| COMPLETION OF KINENI BOREHOLE DRILLING CGN/T009/2014-2015 |
|
Water, Sanitation, and Irrrigation |
Completed
|
4,475,280.00 |
Esise |
Feedback |
| KIBWOGE POLYTECHNIC |
|
Education and Vocation Training |
Completed
|
2,251,432.40 |
Kemera |
Feedback |
| MATONGO POLYTECHNIC |
|
Education and Vocation Training |
Completed
|
2,366,286.09 |
Magwagwa |
Feedback |
| MISAMBI POLYTECHNIC |
|
Education and Vocation Training |
Completed
|
2,410,750.30 |
Magwagwa |
Feedback |
| KEGWANDA POLYTECHNIC |
|
Education and Vocation Training |
Completed
|
2,402,844.90 |
Rigoma |
Feedback |
| KENYERERE POLYTECHNIC |
|
Education and Vocation Training |
Completed
|
2,050,659.60 |
Magombo |
Feedback |
| ST. STEPHEN EKERUBO POLYTECHNIC |
|
Education and Vocation Training |
Completed
|
2,188,250.40 |
Itibo |
Feedback |
| ST. ELIZABETH EMBARO POLYTECHNIC |
|
Education and Vocation Training |
Completed
|
2,296,481.00 |
Rigoma |
Feedback |
| SAIGANGIYA POLYTECHNIC |
|
Education and Vocation Training |
Completed
|
2,260,538.00 |
Nyansiongo |
Feedback |
| MONGORI POLYTECHNIC |
|
Education and Vocation Training |
Completed
|
2,343,520.20 |
Mekenene |
Feedback |
| RITIBO POLYTECHNIC |
|
Education and Vocation Training |
Completed
|
2,238,057.60 |
Gesima |
Feedback |
| NYAIRANG’A POLYTECHNIC |
|
Education and Vocation Training |
Completed
|
2,226,585.20 |
Ekerenyo |
Feedback |
| NYAIKURO POLYTECHNIC |
|
Education and Vocation Training |
Completed
|
2,085,491.20 |
Manga |
Feedback |
| NASARI POLYTECHNIC |
|
Education and Vocation Training |
Completed
|
1,596,450.00 |
Itibo |
Feedback |
| MONG’ONI POLYTECHNIC |
|
Education and Vocation Training |
Completed
|
2,006,840.60 |
Rigoma |
Feedback |
| MARIBA YOUTH POLYTECHNIC |
|
Education and Vocation Training |
Completed
|
2,427,926.20 |
Bosamaro |
Feedback |
| BOBEMBE YOUTH POLYTECHNIC |
|
Education and Vocation Training |
Completed
|
2,550,271.60 |
Bogichora |
Feedback |
| ST. ANDREWS KEREMA POLYTECHNIC |
|
Education and Vocation Training |
Completed
|
2,565,363.20 |
Kiabonyoru |
Feedback |
| MANGA DEB PRIMARY ECD CLASSROOM |
|
Education and Vocation Training |
Completed
|
2,812,848.04 |
Esise |
Feedback |
| MAKAIRO DEB PRIMARY ECD CLASSROOM |
|
Education and Vocation Training |
Completed
|
2,853,981.00 |
Bogichora |
Feedback |
| NYAKONGO PRIMARY ECD CLASSROOM |
|
Education and Vocation Training |
Completed
|
2,735,998.04 |
Manga |
Feedback |
| KENYERERE ECD CLASSROOM |
|
Education and Vocation Training |
Completed
|
2,751,096.60 |
Magwagwa |
Feedback |
| NYANCHONORIA ECD CLASSROOM |
|
Education and Vocation Training |
Completed
|
2,978,516.00 |
Rigoma |
Feedback |
| NYAGACHO PRIMARY ECD CLASSROOM |
|
Education and Vocation Training |
Completed
|
2,664,805.80 |
Mekenene |
Feedback |
| IBARA DOK PRIMARY ECD CLASSROOM |
|
Education and Vocation Training |
Completed
|
2,854,394.60 |
Kiabonyoru |
Feedback |
| NYAKEORE PRIMARY ECD CLASSROOM |
|
Education and Vocation Training |
Completed
|
2,729,017.00 |
Bonyamatuta |
Feedback |
| NYAMBOGO PRIMARY ECD CLASSROOM |
|
Education and Vocation Training |
Completed
|
2,853,981.00 |
Magombo |
Feedback |
| NYAMAURO PRIMARY ECD CLASSROM |
|
Education and Vocation Training |
Completed
|
2,500,013.44 |
Itibo |
Feedback |
| CONST. OF ECDE CENTRE AT EGETONTO PRI. SCH. NYCG/Q174/2015-2016 |
|
Education and Vocation Training |
Completed
|
3,914,385.00 |
Bokeira |
Feedback |
| CONST. OF ECDE CENTRE AT RIAGECHURE PRI. SCH. NYCG/Q175/2015-2016 |
|
Education and Vocation Training |
Completed
|
3,559,953.00 |
Magombo |
Feedback |
| CONST. OF ECDE CENTRE AT EKORO PRI. SCH. NYCG/Q258/2015-2016 |
|
Education and Vocation Training |
Completed
|
3,810,527.60 |
Bosamaro |
Feedback |
| LOCAL AREA NETWORK CONNECTION NYCG/Q271/2015-2016 |
|
Education and Vocation Training |
Completed
|
2,940,310.00 |
Township |
Feedback |
| PROVISION OF BULK SMS OVER INTERNET PROTOCOL NYCG/Q271.A/2015-2016 |
|
Education and Vocation Training |
Completed
|
1,999,840.00 |
Township |
Feedback |
| INSTALLATION OF HEALTH MANAGEMENT INFORMATION SYSTEM {HMIS} |
|
Health Services |
Completed
|
5,449,500.00 |
Township |
Feedback |
| REHABILITATION OF LEVEL 4 HOSPITAL KITCHEN |
|
Health Services |
Completed
|
13,827,136.20 |
Township |
Feedback |
| REHABILITATION OF LEVEL 4 HOSPITAL PLUMBING |
|
Health Services |
Completed
|
14,406,712.80 |
Township |
Feedback |
| ESIENYI H/C |
|
Health Services |
Completed
|
3,343,967.00 |
Bokeira |
Feedback |
| KAMBINI H/C |
|
Health Services |
Completed
|
2,104,690.10 |
Gesima |
Feedback |
| KENYORO H/C |
|
Health Services |
Completed
|
1,601,149.00 |
Itibo |
Feedback |
| MOTAGARA H/C |
|
Health Services |
Completed
|
3,263,207.00 |
Bosamaro |
Feedback |
| NYAGACHO H/C |
|
Health Services |
Completed
|
1,501,208.72 |
Mekenene |
Feedback |
| NYAIGUTA H/C |
|
Health Services |
Completed
|
|
Gesima |
Feedback |
| NYANCHONORIA H/C |
|
Health Services |
Completed
|
711,080.00 |
Rigoma |
Feedback |
| NYANDOCHE IBERE H/C |
|
Health Services |
Completed
|
2,797,340.00 |
Nyansiongo |
Feedback |
| NYANSABAKWA H/C |
|
Health Services |
Completed
|
2,347,352.34 |
Nyamaiya |
Feedback |
| NYARONDE H/C |
|
Health Services |
Completed
|
1,819,146.80 |
Nyansiongo |
Feedback |
| NYANSAGIO H/C |
|
Health Services |
Completed
|
1,140,581.60 |
Nyamaiya |
Feedback |
| ORWAKI H/C |
|
Health Services |
Completed
|
|
Bokeira |
Feedback |
| RIGOMA H/C |
|
Health Services |
Completed
|
2,050,224.81 |
Rigoma |
Feedback |
| RIKENYE H/C |
|
Health Services |
Completed
|
962,220.58 |
Rigoma |
Feedback |
| SERE H/C |
|
Health Services |
Completed
|
1,704,028.40 |
Ekerenyo |
Feedback |
| GIANCHORE H/C |
|
Health Services |
Completed
|
2,411,251.20 |
Bogichora |
Feedback |
| RIANYAMBWEKE H/C |
|
Health Services |
Completed
|
3,214,870.40 |
Bomwagamo |
Feedback |
| IKOBE H/C |
|
Health Services |
Completed
|
|
Manga |
Feedback |
| KEGINGA DISP |
|
Health Services |
Completed
|
3,407,088.20 |
Mekenene |
Feedback |
| ENSOKO DISP |
|
Health Services |
Completed
|
1,305,731.38 |
Esise |
Feedback |
| COMPLETION OF STAFF HOUSE AT NYAKONGO DISP |
|
Health Services |
Completed
|
3,598,795.42 |
Kiabonyoru |
Feedback |
| MOKOMONONI H/C |
|
Health Services |
Completed
|
|
Kiabonyoru |
Feedback |
| MOCHENWA H/C |
|
Health Services |
Completed
|
3,404,580.60 |
Gesima |
Feedback |
| EMENYENCHE H/C |
|
Health Services |
Completed
|
2,535,067.48 |
Gesima |
Feedback |
| RIGOKO DISP |
|
Health Services |
Completed
|
1,170,196.40 |
Nyansiongo |
Feedback |
| MONGORISI DISP |
|
Health Services |
Completed
|
3,709,987.40 |
Bogichora |
Feedback |
| GIRANGO DISP |
|
Health Services |
Completed
|
4,118,600.00 |
Gachuba |
Feedback |
| TINDERETI DISP |
|
Health Services |
Completed
|
|
Nyansiongo |
Feedback |
| RAITIGO DISP |
|
Health Services |
Completed
|
1,496,091.44 |
Esise |
Feedback |
| KIENDEGE DISP |
|
Health Services |
Completed
|
3,697,981.40 |
Kemera |
Feedback |
| ISOGE DISP |
|
Health Services |
Completed
|
3,838,242.80 |
Esise |
Feedback |
| NYABWERI |
|
Health Services |
Completed
|
2,306,149.60 |
Bomwagamo |
Feedback |
| BOSIANGO |
|
Health Services |
Completed
|
1,657,060.00 |
Bosamaro |
Feedback |
| KIAMANYOMBA |
|
Health Services |
Completed
|
|
Magwagwa |
Feedback |
| MOSOBETI |
|
Health Services |
Completed
|
2,484,946.00 |
Gesima |
Feedback |
| MOTONTERA |
|
Health Services |
Completed
|
1,409,724.80 |
Nyamaiya |
Feedback |
| ENDIBA |
|
Health Services |
Completed
|
2,783,014.00 |
Kiabonyoru |
Feedback |
| NYAKEGOGI |
|
Health Services |
Completed
|
2,036,414.80 |
Kemera |
Feedback |
| KERUMBE |
|
Health Services |
Completed
|
2,529,059.00 |
Mekenene |
Feedback |
| NYANKONO |
|
Health Services |
Completed
|
1,562,025.00 |
Mekenene |
Feedback |
| RIAKINARO |
|
Health Services |
Completed
|
1,846,781.48 |
Bonyamatuta |
Feedback |
| KENYENYA |
|
Health Services |
Completed
|
1,536,306.32 |
Bonyamatuta |
Feedback |
| NYAGANCHA |
|
Health Services |
Completed
|
1,248,165.80 |
Gachuba |
Feedback |
| MAGWAGWA |
|
Health Services |
Completed
|
|
Magwagwa |
Feedback |
| NYANGWETA |
|
Health Services |
Completed
|
2,523,660.00 |
Bosamaro |
Feedback |
| KEMUNCHUGU |
|
Health Services |
Completed
|
2,576,857.35 |
Bokeira |
Feedback |
| KENYERERE |
|
Health Services |
Completed
|
2,228,226.00 |
Bonyamatuta |
Feedback |
| ETURUNGI |
|
Health Services |
Completed
|
1,741,538.74 |
Kiabonyoru |
Feedback |
| IKONGE |
|
Health Services |
Completed
|
1,354,010.00 |
Itibo |
Feedback |
| MIRIRI |
|
Health Services |
Completed
|
1,775,887.20 |
Gachuba |
Feedback |
| MANGA SUB COUNTY |
|
Health Services |
Completed
|
1,946,426.00 |
Manga |
Feedback |
| MECHEO |
|
Health Services |
Completed
|
437,436.00 |
Kiabonyoru |
Feedback |
| TING’A |
|
Health Services |
Completed
|
2,492,943.20 |
Bosamaro |
Feedback |
| TOMBE |
|
Health Services |
Completed
|
609,000.00 |
Manga |
Feedback |
| MAGOMBO GUCHA |
|
Health Services |
Completed
|
1,722,837.00 |
Gachuba |
Feedback |
| ETONO |
|
Health Services |
Completed
|
1,685,403.50 |
Bomwagamo |
Feedback |
| CHINA |
|
Health Services |
Completed
|
1,413,819.60 |
Itibo |
Feedback |
| SIRATE |
|
Health Services |
Completed
|
1,067,942.34 |
Magombo |
Feedback |
| MAGOMBO H/C |
|
Health Services |
Completed
|
1,154,379.00 |
Magombo |
Feedback |
| EKERENYO |
|
Health Services |
Completed
|
764,398.00 |
Ekerenyo |
Feedback |
| KIANGOSO DISP |
|
Health Services |
Completed
|
|
Kemera |
Feedback |
| KIOMARA DISP |
|
Health Services |
Completed
|
1,602,979.18 |
Magombo |
Feedback |
| AMATERIO DISP |
|
Health Services |
Completed
|
3,145,628.00 |
Kiabonyoru |
Feedback |
| NYABONGE DISP |
|
Health Services |
Completed
|
1,723,579.04 |
Itibo |
Feedback |
| REFURBISHMENT OF NYAMIRALEVEL 4 HOSPITAL MAIN GATE CGN/149/2013-14 |
|
Health Services |
Completed
|
7,680,831.54 |
Township |
Feedback |
| REVERSE OSMOSIS WATER TREATMENT SYSTEM |
|
Health Services |
Completed
|
3,350,000.00 |
Township |
Feedback |
| INSTALLATION OF ELECTRICAL CABLING IN THE NCH CT SCAN ROOM NYCG/Q04/ 2014-2015 |
|
Health Services |
Completed
|
3,091,400.00 |
Township |
Feedback |
| NYAMWETUREKO H F NYCG/Q051/2014-2015 |
|
Health Services |
Completed
|
2,392,140.40 |
Township |
Feedback |
| MEDICAL EQUIPMENTS AND TOOLS FOR CT SCAN ROOM. (Holley Cotec) |
|
Health Services |
Completed
|
735,800.00 |
Township |
Feedback |
| LABORATORY EQUIPMENTS ( Science Scope Ltd) |
|
Health Services |
Completed
|
1,110,000.00 |
Township |
Feedback |
| LABORATORY EQUIPMENTS (Divine Agents) |
|
Health Services |
Completed
|
|
Township |
Feedback |
| LABORATORY EQUIPMENTS ( Crown Solutions) |
|
Health Services |
Completed
|
3,616,250.00 |
Township |
Feedback |
| LABORATORY EQUIPMENTS (Faram E. A Ltd) |
|
Health Services |
Completed
|
9,574,146.21 |
Township |
Feedback |
| LABORATORY EQUIPMENTS (Holley Cotec) |
|
Health Services |
Completed
|
|
Township |
Feedback |
| LABORATORY EQUIPMENTS (Hass Scientific) |
|
Health Services |
Completed
|
|
Township |
Feedback |
| AMBULANCE |
|
Health Services |
Completed
|
8,000,000.00 |
Township |
Feedback |
| THREATRE EQUIPMENT AND SURGICAL INSTRUMENTS () |
|
Health Services |
Completed
|
3,350,000.00 |
Township |
Feedback |
| THREATRE EQUIPMENT AND SURGICAL INSTRUMENTS (Holley Cotec E. A) |
|
Health Services |
Completed
|
4,962,000.00 |
Township |
Feedback |
| THREATRE EQUIPMENT AND SURGICAL INSTRUMENTS (Nairobi Enterprise) |
|
Health Services |
Completed
|
|
Township |
Feedback |
| THREATRE EQUIPMENT AND SURGICAL INSTRUMENTS (Njimia Pharmaceuticals) |
|
Health Services |
Completed
|
|
Township |
Feedback |
| THREATRE EQUIPMENT AND SURGICAL INSTRUMENTS (Spenomatic Kenya Ltd) |
|
Health Services |
Completed
|
8,500,000.00 |
Township |
Feedback |
| THREATRE EQUIPMENT AND SURGICAL INSTRUMENTS (A1 Healthcare Ltd) |
|
Health Services |
Completed
|
|
Township |
Feedback |
| TWO NO. DIALYSIS MACHINES (Crown Health Care) NYCG/Q135/2014 -2015 |
|
Health Services |
Completed
|
3,364,000.00 |
Township |
Feedback |
| MATERNITY BLOCK AT KIANGOSO HEALTH FACILITY NYCG/Q117/2014-2015 |
|
Health Services |
Completed
|
|
Kemera |
Feedback |
| MATERNITY BLOCK AT KIANUNGU HEALTH FACILITY NYCG/Q118/2014-2015 |
|
Health Services |
Completed
|
3,994,261.60 |
Bosamaro |
Feedback |
| STAFF QUARTERS AND FENCING OF OGANGO HEALTH FACILITY NYCG/Q120/2014-2015 |
|
Health Services |
Completed
|
1,647,414.60 |
Manga |
Feedback |
| RENOVATION WORKS IKOBE HEALTH FACILITY NYCG/Q124/2014-2015 |
|
Health Services |
Completed
|
|
Manga |
Feedback |
| NYAMIRA LEVEL 5 HOSPITAL CASUALITY BLOCK NYCG/Q125/2014-2015 |
|
Health Services |
Completed
|
1,255,763.80 |
Township |
Feedback |
| NYAMIRA LEVEL 5 HOSPITAL MATERNITY BLOCK NYCG/Q136/2014-2015 |
|
Health Services |
Completed
|
3,384,769.80 |
Township |
Feedback |
| NYAMIRA LEVEL 5 HOSPITAL AMENITY BLOCK NYCG/Q137/2014-2015 |
|
Health Services |
Completed
|
|
Township |
Feedback |
| MATERNITY BLOCK AT MOKOMONI HEALTH FACILITY NYCG/Q142/2014-2015 |
|
Health Services |
Completed
|
3,382,490.00 |
Kiabonyoru |
Feedback |
| SUPPLY AND DELIVERY OF WATER PUMP NYCG/Q104/2015-2016 |
|
Health Services |
Completed
|
1,998,000.00 |
Township |
Feedback |
| CONSTRUCTION OF 2.NO PIT LATRINES AT MACHURURIATI DESPENSARY NYCG/Q008/2015 - 2016 |
|
Health Services |
Completed
|
|
Rigoma |
Feedback |
| CONSTRUCTION OF OUT-PATIENT BLOCK AT NYAGACHO HEALTH FACILITY NYCG/Q033/2015 - 2016 |
|
Health Services |
Completed
|
1,960,930.12 |
Kiabonyoru |
Feedback |
| CONSTRUCTION OF TOILET BLOCK AT NYAMAIRA LEVEL 4 HOSPITAL NYCG/Q049/2015 - 2016 |
|
Health Services |
Completed
|
|
Township |
Feedback |
| COMPLETION OF LABORATORY BLOCK AT MANGA SUB-COUNTY DIST. HOSPITAL NYCG/Q050/2015 - 2016 |
|
Health Services |
Completed
|
2,209,742.00 |
Manga |
Feedback |
| Construction and Completion of 80 Bed Amenity Block with |Doctor’s Plaza at Nyamira County Referral Hospital CGN/T075/2015-16 |
|
Health Services |
Completed
|
16,201,361.56 |
Township |
Feedback |
| CONSTRUCTION AND COMPLETION OF OPERATING THEATRE AT NYAMIRA COUNTY REFERRAL HOSPITAL CGN/T076/2015-16 |
|
Health Services |
Completed
|
6,764,958.00 |
Township |
Feedback |
| SUPPLY, DELIVERY, INSTALLATION, TESTING AND COMMISSIONING OF A 5-BED ICU UNIT AT NYAMIRA COUNTY REFERRAL HOSPITAL CGN/T080/2015-2016 |
|
Health Services |
Completed
|
19,308,400.00 |
Township |
Feedback |
| SUPPLY & DELIVERY 5ICU VENTILATORS WITH TRAY, 5 PATIENT MONITOR, 5 INFUSION PUMP AND 5 SYRINGE PUMP, AT NYAMIRA COUNTY REFERRAL HOSPITAL CGN/T080/2015-2016 |
|
Health Services |
Completed
|
|
Township |
Feedback |
| SUPPLY & DELIVERY OF 2 SEMIFOWLER ELECTRIC BED, EMERGENCY/ANASTHESIA TRAY AND 10 I.V POLES AT NYAMIRA COUNTY REFERRAL HOSPITAL CGN/T080/2015-2016 |
|
Health Services |
Completed
|
|
Township |
Feedback |
| SUPPLY, DELIVERY, INSTALLATION, TESTING AND COMMISSIONING OF A MEDICAL OXYGEN GENERATING PLANT AT NYAMIRA COUNTY REFERRAL HOSPITAL CGN/T082/2015-2016 |
|
Health Services |
Completed
|
|
Township |
Feedback |
| SUPPLY OF MEDICAL EQUIPMENTS NYCG/Q246/2015-2016 |
|
Health Services |
Completed
|
2,780,000.00 |
Township |
Feedback |
| MAGWAGWA MARKET CGN/T031/2014-2015 |
|
Lands, Housing and Urban Development |
Completed
|
14,615,525.56 |
Magwagwa |
Feedback |
| IKONGE MARKET CGN/T032/2014-2015 |
|
Lands, Housing and Urban Development |
Completed
|
10,269,278.16 |
Township |
Feedback |
| NYAMIRA COUNTY KIOSKIS CGN/T033/2014-2015 |
|
Lands, Housing and Urban Development |
Completed
|
N/A |
Township |
Feedback |
| MAGOMBO MARKET CGN/T034/2014-2015 |
|
Lands, Housing and Urban Development |
Completed
|
10,443,391.00 |
Magombo |
Feedback |
| MOSOBETI MARKET CGN/T035/2014-2015 |
|
Lands, Housing and Urban Development |
Completed
|
13,149,349.19 |
Gesima |
Feedback |
| MOKOMONI MARKET CGN/T036/2014-2015 |
|
Lands, Housing and Urban Development |
Completed
|
14,632,790.00 |
Mekenene |
Feedback |
| REFURBSHMENT OF HOSPITAL STAFF QUARTERS |
|
Lands, Housing and Urban Development |
Completed
|
2,280,000.00 |
Township |
Feedback |
| RENOVATION OF OFFICE |
|
Lands, Housing and Urban Development |
Completed
|
1,537,580.00 |
Township |
Feedback |
| CONSTRUCTION OF SEPTIC TANK AT NYAMIRA DISTRICT HOSPITAL STAFF QUARTERS |
|
Lands, Housing and Urban Development |
Completed
|
1,823,024.05 |
Township |
Feedback |
| MOTOR CYCLE SHADE AT RAITIGO MKT NYCG/Q009/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
|
Esise |
Feedback |
| MOTOR CYCLE SHADES AT NYANDOCHE IBERE STAGE NYCG/Q010/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
|
Nyansiongo |
Feedback |
| MOTOR CYCLE SHADE AT MABARIRI NYCG/Q013/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
173,994.13 |
Bomwagamo |
Feedback |
| MOTOR CYCLE SHADE AT ISINTA MKT NYCG/Q014/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
199,868.00 |
Itibo |
Feedback |
| MOTOR CYCLE SHADE AT EKERENYO STAGE NYCG/Q015/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
189,613.00 |
Ekerenyo |
Feedback |
| MOTOR CYCLE SHADE AT IKONGE NYCG/Q015/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
199,868.00 |
Ekerenyo |
Feedback |
| MOTOR CYCLE SHADE AT MOTURUMESI NYCG/Q018/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
198,302.00 |
Gachuba |
Feedback |
| MOTOR CYCLE SHADE AT GIRANGO NYCG/Q018/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
|
Gachuba |
Feedback |
| MOTOR CYCLE SHADE AT MABUNDU-BOBEMEBE JUNCTION NYCG/Q019/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
|
Bogichora |
Feedback |
| MOTOR CYCLE SHADE AT TINGA MKT NYCG/Q020/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
|
Bosamaro |
Feedback |
| MOTOR CYCLE SHADE AT NYABITE NYCG/Q022/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
|
Township |
Feedback |
| MOTOR CYCLE SHADE AT NYAMIRA STAGE 1. NYCG/Q022/2015-2016 (Vemac) |
|
Lands, Housing and Urban Development |
Completed
|
192,544.00 |
Township |
Feedback |
| MOTOR CYCLE SHADE AT NYAMIRA STAGE 2. NYCG/Q022/2015-2016 (Hemoot) |
|
Lands, Housing and Urban Development |
Completed
|
194,532.00 |
Township |
Feedback |
| MOTOR CYCLE SHADE AT KEMERA STAGE NYCG/Q023/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
185,400.00 |
Kemera |
Feedback |
| MOTOR CYCLE SHADE AT OMOGONHORO STAGE NYCG/Q023/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
200,868.00 |
Kemera |
Feedback |
| MOTOR CYCLE SHADE AT RIKURUMA NYCG/Q025/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
175,055.00 |
Magwagwa |
Feedback |
| MOTOR CYCLE SHADE AT MAGWAGWA MKT NYCG/Q025/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
198,160.00 |
Magwagwa |
Feedback |
| MOTOR CYCLE SHADE AT NYAMAIYA NYCG/Q026/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
|
Nyamaiya |
Feedback |
| MOTOR CYCLE SHADES AT KONATE JUNCTION NYCG/Q027/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
|
Bonyamatuta |
Feedback |
| MOTOR CYCLE SHADE AT KEBIRIGO MARKET NYCG/Q027/2015-2016 (Cmos ) |
|
Lands, Housing and Urban Development |
Completed
|
|
Bonyamatuta |
Feedback |
| MOTOR CYCLE SHADE AT NYAMUSI NYCG/Q028/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
|
Bokeira |
Feedback |
| MOTOR CYCLE SHADE AT MANGA MKT NYCG/Q009/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
174,754.00 |
Esise |
Feedback |
| MOTOR CYCLE SHADE AT AMAKARA NYCG/Q010/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
179,336.00 |
Nyansiongo |
Feedback |
| MOTOR CYCLE SHADE AT MWAMOGUSII JUNCTION NYCG/Q011/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
|
Mekenene |
Feedback |
| MOTOR CYCLE SHADE AT CHEBILAT NYCG/Q011/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
|
Mekenene |
Feedback |
| MOTOR CYCLE SHADE AT GESIMA MKT NYCG/Q012/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
178,524.00 |
Gesima |
Feedback |
| MOTOR CYCLE SHADE AT ESANI NYCG/Q012/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
|
Gesima |
Feedback |
| MOTOR CYCLE SHADE AT ERONGE NYCG/Q013/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
|
Bomwagamo |
Feedback |
| MOTOR CYCLE SHADE AT TOMBE JUNCTION NYCG/Q014/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
190,762.00 |
Itibo |
Feedback |
| MOTOR CYCLE SHADE AT YAYA CENTRA-NYARAMBA MKT NYCG/Q016/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
|
Kiabonyoru |
Feedback |
| MOTOR CYCLE SHADE AT ONSEKA JUNCTION-NYAWARE RD MOKOMONI MKT NYCG/Q016/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
|
Kiabonyoru |
Feedback |
| MOTOR CYCLE SHADE AT MAGOMBO MKT NYCG/Q017/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
|
Magombo |
Feedback |
| MOTOR CYCLE SHADE AT NYAIKURO STAGE NYCG/Q017/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
|
Magombo |
Feedback |
| MOTOR CYCLE SHADE AT SIRONGA STAGE NYCG/Q019/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
|
Bogichora |
Feedback |
| MOTOR CYCLE SHADE AT MOSOBETI MKT NYCG/Q020/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
|
Bosamaro |
Feedback |
| MOTOR CYCLE SHADE AT TOMBE MKT NYCG/Q021/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
|
Manga |
Feedback |
| MOTOR CYCLE SHADE AT MANGA NYCG/Q021/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
|
Manga |
Feedback |
| MOTOR CYCLE SHADE AT RIGOMA MKT NYCG/Q024/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
181,366.00 |
Rigoma |
Feedback |
| MOTOR CYCLE SHADE AT IBENCHO NYCG/Q025/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
|
Magwagwa |
Feedback |
| MOTOR CYCLE SHADE AT MIRUKA STAGE NYCG/Q026/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
198,603.00 |
Nyamaiya |
Feedback |
| MOTOR CYCLE SHADE AT KEBIRIGO MKT NYCG/Q027/2015-2016 (Ujamaa) |
|
Lands, Housing and Urban Development |
Completed
|
180,000.00 |
Bonyamatuta |
Feedback |
| MOTOR CYCLE SHADE AT OMOSARIA NYCG/Q028/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
195,402.00 |
Bokeira |
Feedback |
| OPENING OF IKONGE ROAD (LAOUR BASED METHOD) |
|
Lands, Housing and Urban Development |
Completed
|
2,500,000.00 |
Ekerenyo |
Feedback |
| COMPLETION OF NYABITE RETAIL MARKET CGN/T061/2015 -2016 |
|
Lands, Housing and Urban Development |
Completed
|
|
Township |
Feedback |
| CONSTRUCTION OF CAR PARKING LOTS IN NYAMIRA TOWN CGN/T062/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
8,913,486.39 |
Township |
Feedback |
| REFURBISHMENT OF HOSPITAL STAFF QUARTERS IN NYAMIRA HOSPITAL NYCG/Q081/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
1,433,866.72 |
Township |
Feedback |
| CONSTRUCTION OF 6 NUMBER PIT LATRINE AT ITIBO NYCG/Q110/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
|
Itibo |
Feedback |
| CONSTRUCTION OF 6 NUMBER PIT LATRINE AT METAMAYWA MKT NYCG/Q113/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
|
Rigoma |
Feedback |
| CONSTRUCTION OF MIRUKA BUS PARK NYCG/Q216/2015-2016. |
|
Lands, Housing and Urban Development |
Completed
|
2,310,956.00 |
Nyamaiya |
Feedback |
| REFURBISHMENT OF NYANSIONGO TOWN ADMINISTRATION OFFICES NYCG/Q229/2015-2016 |
|
Lands, Housing and Urban Development |
Completed
|
1,321,770.00 |
Nyansiongo |
Feedback |
| PROPOSED CONSTRUCTION OF CAR PARKING LOTS BETWEEN NYAMIRA LEVEL 5 HOSPITAL AND HUDUMA CENTRE IN NYAMIRA TOWN (LOT-2) CGN/T08/2016-2017 |
|
Lands, Housing and Urban Development |
Completed
|
|
Township |
Feedback |
| PROPOSED CONSTRUCTION OF CAR PARKING LOTS BETWEEN PUBLIC WORKS AND CO-OP BANK IN NYAMIRA TOWN (LOT-1) CGN/T09/2016-2017 |
|
Lands, Housing and Urban Development |
Completed
|
15,376,187.00 |
Township |
Feedback |
| EXPRESSION OF INTEREST FOR PURCHASE OF LAND WITHIN KEROKA TOWN ( 2 ACRES) CGN/EOI/1/2016-2017 |
|
Lands, Housing and Urban Development |
Completed
|
3,800,000.00 |
Rigoma |
Feedback |
| EXPRESSION OF INTEREST FOR PURCHASE OF LAND WITHIN KIABONYORU WARD ( 2 ACRES) CGN/EOI/1/2016-2017 |
|
Lands, Housing and Urban Development |
Completed
|
3,600,000.00 |
Kiabonyoru |
Feedback |
| OMORARE BOREHOLE CGN/T038/2014-2015 |
|
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
3,744,375.00 |
Ekerenyo |
Feedback |
| NYARIACHO BOREHOLE CGN/T039/2014-2015 |
|
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
2,524,276.00 |
Gachuba |
Feedback |
| NYANCHONORIA BOREHOLE CGN/T040/2014-2015 |
|
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
2,583,320.00 |
Rigoma |
Feedback |
| NYANDOCHE IBERE B/HOLE CGN/T041/2014-2015 |
|
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
2,457,460.00 |
Nyansiongo |
Feedback |
| CONSTRUCTION OF BOMWAGAMO NYAMUSI WATER SUPPLY CGN/T063/2015 - 2016 |
|
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
10,757,296.79 |
Bomwagamo |
Feedback |
| DRILLING OF ENCHORO BOREHOLE CGN/T064/2015 - 2016 |
|
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
3,150,188.80 |
Bosamaro |
Feedback |
| CONSTRUCTION OF KEMASARE WATER PROJECT CGN/T065/2015 - 2016 |
|
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
18,598,687.00 |
Nyamaiya |
Feedback |
| CONSTRUCTION OF KITARU EMBOYE WATER PROJECT CGN/T066/2015 - 2016 |
|
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
3,906,100.00 |
Mekenene |
Feedback |
| CONSTRUCTION OF NYABISIMBA WATER SUPPLY CGN/T067/2015 - 2016 |
|
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
2,779,462.50 |
Bonyamatuta |
Feedback |
| CONSTRUCTION OF NYANSIONGO GEKONGE WATER SUPPLY CGN/T068/2015 - 2016 |
|
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
7,073,475.00 |
Bokeira |
Feedback |
| CONSTRUCTION OF RAITIGO WATER SUPPLY CGN/T069/2015 - 2016 |
|
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
8,441,316.00 |
Esise |
Feedback |
| CONSTRUCTION OF RITIBO WATER SUPPLY CGN/T070/2015 - 2016 |
|
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
2,649,966.95 |
Gesima |
Feedback |
| PROPOSED CONST. OF KEMASARE II WATER SUPPLY CGN/T020/2016-2017 |
|
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
2,500,000.00 |
Nyamaiya |
Feedback |
| PROPOSED CONST. OF NYAMBARIA I WATER PROJECT CGN/T021/2016-2017 |
|
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
|
Magombo |
Feedback |
| PROPOSED DRILLING OF BOSIANGO BOREHOLECGN/T022/2016-2017 |
|
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
|
Bogichora |
Feedback |
| PROPOSED CONST. OF ERONGE PRIMARY WATER SUPPLY CGN/T023/2016-2017 |
|
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
|
Esise |
Feedback |
| PROPOSED DRILLING OF GESURE BOREHOLE CGN/T024/2016-2017 |
|
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
3,254,960.00 |
Manga |
Feedback |
| PROPOSED DRILLING OF RIOMEGO BOREHOLE CGN/T025/2016-2017 |
|
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
|
Magwagwa |
Feedback |
| PROPOSED CONST. OF NYANSIONGO GEKONGE II WATER SUPPLY CGN/T026/2016-2017 |
|
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
1,500,000.00 |
Magwagwa |
Feedback |
| PROPOSED CONST. OF RAITIGO II WATER SUPPLY CGN/T027/2016-2017 |
|
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
3,000,000.00 |
Esise |
Feedback |
| PROPOSED CONST. OF KIABONYORU WATER SUPPLY CGN/T028/2016-2017 |
|
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
|
Kiabonyoru |
Feedback |
| PROPOSED CONST. OF NYANCHONORIA WATER SUPPLY CGN/T029/2016-2017 |
|
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
|
Rigoma |
Feedback |
| PROPOSED CONST. OF NYANDOCHE IBERE WATER SUPPLY CGN/T030/2016-2017 |
|
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
|
Nyansiongo |
Feedback |
| PROPOSED CONST. OF NYARIACH WATER SUPPLY CGN/T031/2016-2017 |
|
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
|
Gachuba |
Feedback |
| PROPOSED CONST. OF OMORARE WATER SUPPLY CGN/T032/2016-2017 |
|
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
2,500,000.00 |
Ekerenyo |
Feedback |
| SUPPLY, DELIVERY, INSTALLATION, COMMISSIONING AND MAINTENANCE OF 42 POLES SOLAR POWERED STREET LIGHTING PROJECT IN NYAMIRA COUNTY CGN/T057/2016-2017 |
|
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
8,783,932.00 |
Township |
Feedback |
| NYABITE MARKET |
|
Trade, Tourism and Co-operative Development |
Completed
|
11,900,416.40 |
Township |
Feedback |
| KEROKA MARKET |
|
Trade, Tourism and Co-operative Development |
Completed
|
24,099,139.00 |
Rigoma |
Feedback |
| GIRANGO MARKET |
|
Trade, Tourism and Co-operative Development |
Completed
|
11,230,686.50 |
Gachuba |
Feedback |
| KIOGE MKT TOILET |
|
Trade, Tourism and Co-operative Development |
Completed
|
804,170.00 |
|
Feedback |
| NYAMUSI MKT TOILET |
|
Trade, Tourism and Co-operative Development |
Completed
|
739,123.00 |
Bokeira |
Feedback |
| ITIBO MKT TOILET |
|
Trade, Tourism and Co-operative Development |
Completed
|
726,531.20 |
Itibo |
Feedback |
| MAKAIRO MKT TOILET |
|
Trade, Tourism and Co-operative Development |
Completed
|
739,964.00 |
Bogichora |
Feedback |
| TOMBE MKT TOILET |
|
Trade, Tourism and Co-operative Development |
Completed
|
765,036.00 |
Manga |
Feedback |
| NYARAMBA MKT TOILET |
|
Trade, Tourism and Co-operative Development |
Completed
|
N/A |
Kiabonyoru |
Feedback |
| KEGOGI MKT TOILET |
|
Trade, Tourism and Co-operative Development |
Completed
|
726,973.20 |
Kiabonyoru |
Feedback |
| NYARONDE MKT TOILET |
|
Trade, Tourism and Co-operative Development |
Completed
|
726,512.64 |
Nyansiongo |
Feedback |
| MOCHENWA MKT TOILET |
|
Trade, Tourism and Co-operative Development |
Completed
|
727,612.60 |
Gesima |
Feedback |
| BONYUNYU MKT TOILET |
|
Trade, Tourism and Co-operative Development |
Completed
|
748,870.00 |
Nyamaiya |
Feedback |
| GESIMA MKT TOILET |
|
Trade, Tourism and Co-operative Development |
Completed
|
769,901.00 |
Gesima |
Feedback |
| MIRUKA MKT TOILET |
|
Trade, Tourism and Co-operative Development |
Completed
|
826,256.40 |
Nyamaiya |
Feedback |
| PROPOSED CONST. AND COMPLETION OF MANGA FENCE NYCG/Q339/2016-2017 |
|
Trade, Tourism and Co-operative Development |
Completed
|
2,571,383.00 |
Manga |
Feedback |
| PROPOSED CONST. AND COMPLETION OF MOKOMONI MARKET FENCE NYCG/Q340/2016-2017 |
|
Trade, Tourism and Co-operative Development |
Completed
|
2,084,847.70 |
Mekenene |
Feedback |
| PROPOSED CONST. AND COMPLETION OF MAGWAGWA MARKET FENCE NYCG/Q341/2016-2017 |
|
Trade, Tourism and Co-operative Development |
Completed
|
2,099,890.00 |
Magwagwa |
Feedback |
| INTERNET & INTERCOM CONNECTIVITY |
|
Finance ICT and Economic Planning |
Completed
|
1,856,649.60 |
Township |
Feedback |
| REFURBISHMENT TO ECM FINANCE'S OFFICE NYCG/Q065/2014-2015 |
|
Finance ICT and Economic Planning |
Completed
|
3,757,530.00 |
Township |
Feedback |
| RENOVATION OF KITCHEN AND DINING HALL AT KIENDEGE HIGH SCHOOL NYCG/Q124/2015-2016 |
|
Gender, Youth, Sports, Culture and Social Services |
Completed
|
1,394,633.00 |
Kemera |
Feedback |
| RENOVATION OF BOYS DORMITORY, GIRLS DORMITORY AND 8NO. CLASSROOMS AT KIENDEGE HIGH SCHOOL NYCG/Q125/2015-2016 |
|
Gender, Youth, Sports, Culture and Social Services |
Completed
|
2,219,207.60 |
Kemera |
Feedback |
| SUPPLY OF TOOLS AND EQUIPMENTS NYCG/Q210/2015-2016 |
|
Gender, Youth, Sports, Culture and Social Services |
Completed
|
1,635,000.00 |
Kemera |
Feedback |
| RENOVATION OF HRM OFFICE/ REGISTRY OFFICE WING NYCG/Q083/ 2015 - 2016 |
|
Public Service Management |
Completed
|
1,199,629.00 |
Township |
Feedback |
| RENOVATIONOF PACDU OFFICE COUNTY HEADQUARTERS |
|
Public Service Management |
Completed
|
2,218,511.60 |
Township |
Feedback |
| RENOVATION OF CHIEF'S CAMP |
|
Public Service Management |
Completed
|
3,699,020.00 |
Township |
Feedback |
| RENOVATION OF DEPUTY COMMISIONER'S OFFICE |
|
Public Service Management |
Completed
|
1,200,832.00 |
Township |
Feedback |
| CONSTRUCTION OF STORE AND TOILET BLOCK |
|
Public Service Management |
Completed
|
3,944,098.40 |
Township |
Feedback |
| Construction of Nyamusi market Material recovery facility |
|
Environment, Water, Energy, Mining and Natural Resources |
Completed
|
1,249,544.75 |
Bokeira |
Feedback |
| Restoration of Suguta Wetland |
|
Agriculture, Livestock and Fisheries |
Completed
|
8,066,986.00 |
Magwagwa |
Feedback |
| Construction of Kebirigo market Material recovery facility |
|
Agriculture, Livestock and Fisheries |
Completed
|
1,248,998.39 |
Bonyamatuta |
Feedback |
| Construction of Keroka Material recovery facility |
|
Agriculture, Livestock and Fisheries |
Completed
|
1,240,412.01 |
Rigoma |
Feedback |
| Construction of Nyansiongo business centre Material recovery facility |
|
Agriculture, Livestock and Fisheries |
Completed
|
1,245,152.74 |
Nyansiongo |
Feedback |
| Establishment of Nyamira North sub county indigenous tree nursery |
|
Agriculture, Livestock and Fisheries |
Completed
|
2,990,147.17 |
Ekerenyo |
Feedback |
| Establishment of Masaba North sub county indigenous tree nursery |
|
Agriculture, Livestock and Fisheries |
Completed
|
2,998,397.00 |
Rigoma |
Feedback |
| Ekegoro Borehole Water drilling and Casing project. |
|
Water, Sanitation, and Irrrigation |
Completed
|
2,404,970.00 |
Magwagwa |
Feedback |